Become a Member: JOIN SFPMA TODAY   LogIn / Register: LOGIN/REGISTER

SFPMA Industry Articles | news, legal updates, events & education! 

Find Blog Articles for Florida’s Condo, HOA and the Management Industry. 

Drones capture thousands of high-quality photos as they move in and around buildings at different altitudes.

Drones capture thousands of high-quality photos as they move in and around buildings at different altitudes.

Drones capture thousands of high-quality photos as they move in and around buildings at different altitudes.

Performing drone inspections on a consistent basis allows property managers to observe time-dependent changes such as concrete deterioration, roof wear and tear, and hurricane damage.
At SRI, our FAA-certified pilots perform drone surveys of residential and commercial properties throughout South Florida.
Learn more about our drone services @ https://ow.ly/Qy6u50QWZNw

DRONE SURVEYS

Red circle blog post icon

Drones take many videos and high-quality photos as they move in and around buildings at different altitudes. In a single mission, hundreds of data points can be captured for later use. That data provides a historical record to aid in insurance claims, maintenance and future renovations. At SRI, our FAA-certified pilots perform drone surveys of residential and commercial properties throughout South Florida. We use Catalogger image management software to easily store, search and access image and video data.

FAA-Certified Drone Pilots

All of our pilots have passed the FAA’s Small UAS Rule (Part 107) examination and maintain their flying credentials by passing recurrent examinations every two years.

Image Management with Catalogger
With a simple interface, Catalogger allows users to quickly access and share drone survey photos to guide maintenance, repair, and improvement projects. Image data is stored on the cloud and can be viewed on multiple devices via a password-protected portal.
Mission Planning With Recorded GPS Coordinates

Allows for repeated flights along the same path. Missions can be scheduled periodically to observe time-dependent changes such as concrete deterioration, roof wear and tear, hurricane damage, and modifications to surrounding structures.

Catalogger image management system logo
Tags: , ,
Architectural Committees Formal Procedures, Published Standards, and Self Help by REMBAUM’S ASSOCIATION ROUNDUP

Architectural Committees Formal Procedures, Published Standards, and Self Help by REMBAUM’S ASSOCIATION ROUNDUP

  • Posted: Jun 19, 2024
  • By:
  • Comments: Comments Off on Architectural Committees Formal Procedures, Published Standards, and Self Help by REMBAUM’S ASSOCIATION ROUNDUP

Architectural Committees Formal Procedures, Published Standards, and Self Help

by REMBAUM’S ASSOCIATION ROUNDUP

Formal Procedures

There are strict legal requirements that a homeowners’ association’s (HOA) architectural review committee (ARC) must follow, most especially if the ARC intends to deny an owner’s request. As this author has witnessed countless times, it is likely that many ARCs do not conduct their activities in conformity with Florida law such that an ARC denial may not withstand judicial scrutiny. If these legal requirements are not followed, and the ARC denies the owner’s architectural request, then it would be quite easy for the owner to challenge the ARC’s decision and prevail. Upon prevailing, the owner would be entitled to their prevailing party attorney’s fees and costs, as well. It is so easy to avoid this outcome, yet so few associations take the time to do it right.

Pursuant to §720.303(2), Florida Statutes, a meeting of the ARC is required to be open and noticed in the same manner as a meeting of the association’s board of directors. Notice of the ARC meeting must be posted in a conspicuous place in the community at least 48 hours in advance of the meeting, and the meeting must be open for all members to attend. Further, pursuant to §720.303(2)(c)(3), Florida Statutes, members of the ARC are not permitted to vote by proxy or secret ballot. Also, bare bone minutes should be taken to create a record of ARC decisions—especially denials.

We often hear from many HOAs that the ARC does not meet openly and does not notice their meetings. This leaves decisions made by the ARC vulnerable to challenge. If the ARC denies an application but fails to do so at a properly noticed board meeting, the owner can challenge the denial, claiming that it is not valid because the ARC did not follow proper procedure. In such cases, the ARC’s denial of an application is not valid because the ARC failed to comply with the procedural requirements for the meeting even if an application violates the declaration or other association-adopted architectural standards. However, by complying with the provisions of Chapter 720, Florida Statutes, your HOA can work to avoid this debacle.

 

 

Published Standards

Often a top priority for an HOA is ensuring that homes in the community maintain a harmonious architectural scheme in conformity with community standards and guidelines, and because the ARC is at the frontline of owners’ alterations and improvements to their homes, it is instrumental in ensuring that the community standards and guidelines are met. Pursuant to §720.3035(1), Florida Statutes, an HOA, or the ARC, “has the authority to review and approve plans and specifications only to the extent that the authority is specifically stated or reasonably inferred as to location, size, type, or appearance in the declaration or other published guidelines and standards.” But not every owner request is typically addressed in the declaration or other published guidelines and standards. If not, then the association may not be in a good position for proper denial. Therefore, the ARC is only as effective as the objective guidelines and standards (set forth in the declaration and other published guidelines and standards) are inclusive. So, what is the association to do when the ARC receives an owner’s application for an alteration to the home, but the association does not have any architectural guidelines or standards regulating the requested alteration?

While not court tested yet, a possible solution for this conundrum is to include a “catch-all” provision in the declaration to proactively address those ARC applications where a member may request a modification that is not directly addressed by the governing documents. Such a “catch-all” provision stands for the proposition that, if such a request is made, then the existing state of the community is the applicable standard by which the ARC application is to be judged. For example, imagine if an owner applies to the ARC to paint the owner’s house pink. If there are no architectural guidelines or standards that address what color a house must be, and there are no pink houses in the community, then the existing state of the community may provide a lawful basis for the ARC to deny the request because there are no existing pink houses in the community.

The Trouble With Self-Help Provisions

What if an owner refuses to maintain the owner’s property, such as pressure washing a dirty roof, despite the HOA sending demand letters, levying a fine, and perhaps even suspending the owner’s right to use the HOA’s recreational facilities? What is the HOA’s next step? Is it time to file a lawsuit to compel compliance? Well, Chapter 718 (governing condominiums), Chapter 719 (governing cooperatives), and Chapter 720 (governing HOAs) of the Florida Statutes authorize the association to bring an action at law or in equity to enforce the provisions of the declaration against the owner. Additionally, many declarations contain “self-help” language that authorizes the association to cure a violation on behalf of the owner and even, at times, assess the owner for the costs of doing so. These “self-help” provisions generally contain permissive language, meaning the association, may, but is not obligated to, cure the violation. Sadly, in this instance the word “may” means “shall,” and to find out why, read on.

There is a general legal principal that, if a claimant has a remedy at law (e.g., the ability to recover money damages under a contract), then it lacks the legal basis to pursue a remedy in equity (e.g., an action for injunctive relief). Remember, too, that an association’s declaration is a contract. In the context of an association, the legal remedy would be exercising the “self-help” authority granted in the declaration. An equitable remedy would be bringing an action seeking an injunction to compel an owner to take action to comply with the declaration. Generally, a court will only award an equitable remedy when the legal remedy is unavailable, insufficient, or inadequate.

Assume that the association’s declaration contains both the permissive “self-help” remedy and the right to seek an injunction from the court. Accordingly, it would appear the association has a decision to make—go to court to seek the injunction or enter onto the owner’s property, cure the violation, and assess the costs of same to the owner. However, recent Florida case law affirmed a complication to what should be a simple decision. In two cases decided ten years apart, Alorda v. Sutton Place Homeowners Association, Inc., 82 So.3d 1077 (Fla. 2nd DCA 2012) and Mauriello v. Property Owners Association of Lake Parker Estates, Inc., 337 So.3d 484 (Fla. 2nd DCA 2022), Florida’s Second District Court of Appeal decided that an association did not have the right to seek an injunction to compel an owner to comply with the declaration if the declaration provided the association the authority, but not the obligation, to engage in “self-help” to remedy the violation. Expressed simply, this is because the legal contractually based “self-help” remedy must be employed before one can rely upon equitable remedy of an injunction. Therefore, even though the declaration provided for an optional remedy of “self-help,” it must be used before seeking the equitable remedy of an injunction.

In Alorda, the owners failed to provide the association with proof of insurance required by the declaration. Although the declaration allowed the association to obtain the required insurance, the association filed a complaint against the owners seeking injunctive relief, asking the court to enter a permanent mandatory injunction requiring the owners to obtain the requested insurance. The owners successfully argued that even though they violated the declaration, the equitable remedy of an injunction was not available because the association already had an adequate legal remedy—the “self-help” option of purchasing the required insurance and assessing them for same. The Court agreed.

In Mauriello, the declaration contained similar language as in Alorda but involved the issue of the owners failing to keep their lawn and landscaping in good condition as required by the declaration. The association filed a complaint seeking a mandatory injunction ordering the owners to keep their lawn and landscaping in a neat condition. However, the facts were complicated by the sale of the home in the middle of the suit when the new owners voluntarily brought the home into compliance with the declaration. The parties continued to fight over who was entitled to prevailing party attorney’s fees with the association arguing it was entitled to same because the voluntary compliance was only obtained after the association was forced to commence legal action. The owners, citing Alorda, argued that the complaint should have been dismissed at the onset because the association sought an equitable remedy (injunction) when a legal remedy was already available—the exercise of its “self-help” authority. The Court considered the award of attorney’s fees after the dismissal of the association’s action for an injunction. Ultimately, the Court held that the owners were the prevailing party as the association could not seek the injunction because it already had an adequate remedy at law.

Accordingly, if your association’s declaration contains a “self-help” provision, and your association desires to seek an injunction against an owner rather than pursue “self-help,” the board should discuss the issue in greater detail with the association’s legal counsel prior to proceeding. Also, remember that if the association wants to enforce architectural standards, then they must be published to the membership; and always remember to notice ARC meetings and take minutes.

 

Tags: , , ,
Does your building’s exterior need a facelift? Our team of experts specializes in building maintenance and exterior services, from high-rise window cleaning to garage restoration.

Does your building’s exterior need a facelift? Our team of experts specializes in building maintenance and exterior services, from high-rise window cleaning to garage restoration.

Does your building’s exterior need a facelift?

Well it now the Building Inspection! and Your Condo needs this NOW!

Our team of experts specializes in building maintenance and exterior services, from high-rise window cleaning to garage restoration.

Don’t miss out on this opportunity to revamp your building’s look and enjoy a delicious meal on us!

Contact us today to schedule your estimate.

Our Expertise

Our 20+ years expertise in this industry guarantees our work will exceed your expectations.

HIGH-RISE WINDOW CLEANING

FALL PROTECTION

CONCRETE REPAIR & RESTORATION

POWER WASHING & WATERPROOFING

GLASS WINDOW REPLACEMENT

FISP SAFETY INSPECTIONS

 


Why Choose Thompson

Our core values lies in exceeding expectations for our clients, with a focus on accurate quotes, quality work, and the overall positive customer experience. 

Our Expertise

Our 10+ years expertise in this industry guarantees our work will exceed your expectations.

Accurate Quotes

We meet with your team for a quick walkthrough to determine options available within your budget.

Customer Care

We are confident that our customer experience will always be top-notch.

Contact Us:

LET’S CHAT!   (732) 997-8138

 

Tags: , , ,
Don’t let a natural disaster catch your community off guard! Take charge and be prepared!

Don’t let a natural disaster catch your community off guard! Take charge and be prepared!

The coastal Northeast is experiencing a concerning trend of heating at a faster rate compared to other regions in North America. Researchers have identified a strong correlation between the accelerated warming and the rapidly increasing temperatures in the North Atlantic Ocean and increasing storm intensity. Natural disasters such as hurricanes, tornadoes and coastal flooding can strike at any moment, leaving communities devastated and in need of immediate assistance. It is crucial for communities to be prepared in order to minimize the impact of these disasters and ensure the safety of their residents.

Preparing your community for a natural disaster is crucial to minimize damage, save lives, and facilitate a swift recovery. Here are a few steps to assist with your preparation:

Assessment and Planning:

  • Identify the types of natural disasters that are common in your area, such as earthquakes, hurricanes, floods, wildfires, or tornadoes.
  • Conduct a thorough risk assessment to understand the potential impact of these disasters on infrastructure, buildings, and residents.
  • Collaborate with professionals to create a comprehensive disaster preparedness plan.
  • Make sure that the community has backed up records of their site plans, architectural and structural drawings, as this can greatly assist in the post disaster assessment and recovery process.

Initial building evaluation performed based on the severity of the storm/event:

  • The degree of safety & habitability of the subject building is not always obvious. If there is any doubt or question that there may be structural or building envelope damage to a building, call you Professional Engineer or Architect and have an evaluation performed.
  • In some instances, you may be required by your local municipality to have your professional assist with stabilizing the structure before parties can enter the structure to collect personal belonging that may remain.

Communication and Engagement:

  • Establish a reliable communication system to disseminate information before, during, and after a disaster. This can include email, social media, or text alerts.
  • Designate community leaders or volunteers responsible for communicating updates and instructions.

Contact Insurance:

  • It can take a while to get adjusters to scene following an event. Be sure to take before, during and after photos of any damage that occurred.

Post-Disaster Recovery:

  • Establish a recovery plan that includes damage assessment, debris removal, and restoration of essential services.
  • Plans and specifications may be required to repair or reconstruct the building, depending on severity.
  • Code requirements can impact the work based on if it is classified as repair vs reconstruction. This needs to be carefully reviewed and considered as insurance carriers may try to exclude some of the necessary work, so the Architect or Engineer needs to be well versed on preparing plans for this type of work.

Remember, disaster preparedness is an ongoing effort. Regularly review and update your plans based on new information, changing community demographics, and emerging technologies. By taking proactive steps, you can help your community minimize the impact of natural disasters and ensure a more resilient future.

Contact our team for more information how to be proactive! 

The Falcon Group
Miami
15405 NW 7th Avenue in Miami, FL 33169
ph: 305.663.1970 x509
info@falconengineering.com
WEST PALM BEACH, FLORIDA
5651 Corporate Way, Suite 4, West Palm Beach, Florida 33407
Phone: 561-290-0504
info@falconengineering.com
Tags: , , ,
Find everything you need to know about Florida Building Inspections SB-4D

Find everything you need to know about Florida Building Inspections SB-4D

Florida Condo Building Inspections (SB4d)

http://FLBuildingInspections.com  (a division of SFPMA)

Find everything you need to know about Florida Building Inspections SB-4D

It’s a confusing time for everyone affected, and we can all use some extra clarity. Our experts dove through the 88 page document and outline what you need to know about SB-4D so you can focus on making your building safer instead of deciphering the wordy documents.

Florida state legislature took swift action to implement inspection reform to mitigate the risk of a similar tragedy in the future. As of May 27th, 2022, Florida passed several laws to keep building safer in the state by requiring specific inspections and funding mechanisms. These new Florida condo laws mean significant changes for building owners across Florida, all within a relatively short time.

 

The State of Florida Property Management Association with Legal & Engineering Members are here to help you understand the new laws and how to take the correct action now to ensure you are in full compliance.

When you need your condo inspection contact us!

 


More about Florida Building Inspections:

Our Building Services Division, With the addition of the new Law, (SB4D) We have had many calls, emails and messages sent to SFPMA. There are so many with questions, many are still asking what can they do? How do we go about doing these inspections! We are Bringing this information to Boards, Owners and Management Professionals throughout Florida.

Condos need to take action for Registration before January 2023. Next is Inspections by an Engineer or Architect along with Mandatory Reserve Funding.

SFPMA and our Members will provide information to make these new legal requirements easier to understand and learning through the articles re: Legal, Maintenance, Engineering, Services to name a few.

 

Florida Condo Building Inspections (SB4d)

Milestone Inspections

Structural Integrity Reserve Studies

Mandatory Reserves

 

 


On our website and social media we have pages where we post daily with updates, Laws and the Top Companies/Members who are ready to inspect your buildings.

Please like and follow our New Division and Pages,  In time these pages will have the information, New Articles and Contact forms where Boards and Managers can fill out and sfpma will forward these to the Engineers  Members for Inspections.  remember to send articles and other for the new areas,  membership@sfpma.com

as we move into the new year, there will bring many condo changes that buildings, boards and managers will need to comply, SFPMA and our Members are here to guide you and bring you the steps, legal and inspections brought to you by the engineering members.


Our Website:

Florida Condo Building Inspections (SB4d)

http://FLBuildingInspections.com  a division of SFPMA

The State of Florida Property Management Association with Legal & Engineering Members are here to help you understand the new laws and how to take the correct action now to ensure you are in full compliance.


LinkedIn:

Florida Condo Building Inspections

Legal and Service Information for Florida Building Inspections Find the Facts! The information will be posted here from the members of SFPMA and our Management, we want this to be the go to place for all the information for condo Boards ad Owners along with the Management Professionals who need to also know what their buildings need.


Facebook:

@CondoBuildingInspections

 

 

 

Tags: , ,
Drones play a major role in structural evaluation and documentation. by SRI Consultants inc.

Drones play a major role in structural evaluation and documentation. by SRI Consultants inc.

  • Posted: Apr 17, 2024
  • By:
  • Comments: Comments Off on Drones play a major role in structural evaluation and documentation. by SRI Consultants inc.

INNOVATIVE APPROACHES TO DRONE IMAGE MGMT FOR STRUCTURAL EVALUATIONS AND DOCUMENTATION

BY: SHIRISH RAJPATHAK, M.S., P.E., S. I. | PRESIDENT AND FOUNDER

 

Drones play a major role in structural evaluation and documentation. A drone survey of a typical building can generate over 100 GB of data, including thousands of images and videos.

Systematically viewing, sharing, and storing drone data is a major challenge. This post explores the best practices for managing a vast amount of collected imagery, including accessing and sharing images on demand across different platforms (computers, tablets, phones).

Who Needs to Document Structural Conditions and Why?

In view of the building collapse in Surfside, FL, and subsequent action by the State legislature (Florida Senate Bill 4D), many stakeholders, namely high-rise building owners, property management companies, building officials, engineers, and insurers, will need to document the existing conditions of structures.

Drones have already proved to be valuable in search and rescue operations, and after hurricanes, earthquakes, and similar natural disasters. They also play a major role in structural evaluation.For consultants, drone surveys help in a detailed and thorough evaluation of structures. They aid in reducing report preparation time, categorizing the type of damage, determining the quantity and location of damage, providing evidence for expert witness testimonials, as well as optimizing project portfolio, marketing, and advertising. For property owners, they can be important in justifying maintenance and repair expenses and supporting insurance claims. Even contractors can benefit, from documenting pre-construction conditions and construction progress to providing as-built documentation (rebar, PT cables, utility piping layout in slab before concrete pour) and defending legal actions.A drone survey of a typical building can generate over 100 GB (Gigabyte) of data including thousands of images and videos. Systematically viewing, sharing, and storing this data is a major challenge.

This paper will discuss the pros and cons of video versus high-definition still images, how to manage a vast amount of collected imagery, and how to view and share images on demand using different platforms (computers, tablets, or phones).

Video Vs. High-Resolution Still Images

Capturing images using drones is an art! Besides flying skills and knowledge of drones, a drone operator should have good knowledge of photography and videography. The quality of video recording is subject to the type of camera shutter (electronic vs mechanical), frame rate, camera steadiness, and smoothness of panning. Video images tend to be of lower resolution than still images, and they have more compression noise. Also, electronic shutters often produce distortion called rolling shutter. This is also known as “The Jello Effect”

Therefore, video recording may be convenient but not very practical for capturing details. During video recording, the drone is moving continuously. In any given video, one must watch the entire footage to pinpoint a location of interest; and there are often several videos of each structure to watch. This requires tedious time-tagging by someone who is both familiar with the structure and good at problem identification. In reality, videos are best suited for real estate professionals to highlight structures in relation to their surroundings for prospective buyers.

It is important to stress that the flight time of all drones is limited by battery life. Thus, it is critical that each flight is well planned and executed to acquire the maximum information possible.

Many drones today have the built-in capability of producing panoramas from a collection of high-resolution still images, captured while rotating a drone 360 degrees. Each image also contains data such as ISO, exposure, GPS coordinates, and altitude

This information is useful in building a database with powerful indexing functions that link to a visual map and allow users to access any image quickly. Also, still images tend to be of much higher resolution (most drones allow the storing of raw images which are typically 2-3 times larger in file size compared to typical JPEG format). Most importantly, images can be stored on the cloud and accessed via a simple interface.

Regardless of who needs information and for what purpose, information is only good if it is made available when needed. That said, not all consultants conducting structural evaluations need to be certified drone operators. A qualified drone operator can perform a survey with detailed instructions from an engineer, saving time and expense.

Innovative Image Management System

As explained before, still images have the unique advantage of being easy to index. Innovative image management systems automatically catalog drone data as illustrated in the example below. Figure 3 shows a sample site located on the intercoastal waters in South Florida.

The site was imaged with a drone on two consecutive days. Figures 4 and 5 show the locations of the drone flights.

At each of the locations, a drone was flown to various heights, and at each height, a panorama was captured. A drone is always oriented towards the structure to lock in the exposure of the camera. This avoids wash-out or darkening of the subject. To access a panorama at a specific height, one clicks on any blue tag and selects the height from the pop-up table (Figure below).

Two side-by-side photos of client site by drone with blue markers indicating locations where images were acquired

This opens a panorama at the chosen height in an adjacent window (Figure 5 b). After clicking to load the panorama, the user is free to move around, 360 degrees. This allows the user to examine a point of interest in the structure or in the surrounding area. A user can also zoom in or view the structure in full screen. At this point, the user has the choice of capturing the screen or checking the hot spot checkbox at the bottom of the window, which displays hot spots as red circles. These red circles are pointers to the actual drone images stored in the cloud.

Clicking on any of the hot spots activates a pop-up window asking the user to either view the actual image in a new window or download a high-resolution image to their device

Tags: , ,
Get answers to these questions and more on our new “AI for Building Safety” website… where we’re using AI to help answer questions about Florida’s condo safety law.

Get answers to these questions and more on our new “AI for Building Safety” website… where we’re using AI to help answer questions about Florida’s condo safety law.

  • Posted: Apr 17, 2024
  • By:
  • Comments: Comments Off on Get answers to these questions and more on our new “AI for Building Safety” website… where we’re using AI to help answer questions about Florida’s condo safety law.

Get answers to these questions and more on our new “AI for Building Safety” website… where we’re using AI to help answer questions about Florida’s condo safety law.

SRI Consultants…..can help with the questions you may have with the Florida Law SB-4D ( Condo Building Inspections ) 

SRI logo

OUR NEW AI TOOL ANSWERS ALL OF YOUR QUESTIONS ABOUT FLORIDA’S BUILDING SAFETY LAW SB-4D

SRI’s new, experimental website uses AI to help answer questions about Florida’s new building safety law. Do you have questions about milestone inspections? Structural assessment deadlines? Reserves? We’ve got the answers!

 

Ask our AI about 4D

Do you have questions about Florida’s building safety legislation, Senate Bill 4D? Just enter your query in the textbox below and click “Send Query”. For example, try asking, “What is the Florida Senate Bill 4D?”. This AI tool is experimental and provides no warranties regarding the accuracy of its results. Use at your own risk.

Visit SRI’s NEW AI Page 

 


Who is: SRI Consultants.

Here at SRI Consultants, Inc., we take pride in what we do. The extra effort and attention to detail put forth by our team ensure you receive the highest quality services available to the industry, all while saving you time and money. Coastal areas like South Florida have a unique need for concrete rehabilitation and protection services predominantly related to assessing structural damage. Our team has specialists in structural engineering, civil engineering, and corrosion engineering at your disposal.

Round transparent logo with black perimeter and clipboard in center representing Milestone Inspections services

MILESONE INSPECTIONS

Compliance + Safety. Our milestone inspections mitigate the risks of building failure from structural or electrical deficiencies. Focused on occupant safety, inspections are conducted with strict adherence to county and local requirements.

Round transparent logo with black perimeter and suspension bridge in center representing Engineering services

ENGINEERING

Technical Expertise. We are experts in our field with certifications from NACE and FL Board of Professional Engineers. Our team offers civil, structural and corrosion engineering services for single & multi-story structures, condos, hotel and motels, cooling towers and seawalls.

Above are just a few of the services we provide. visit our website to learn more…

Members of SFPMA – Engineers 

 

Tags: , , ,
Mandatory Condominium & Cooperative Building Inspections and Non-Waivable Reserve Requirements | SENATE BILL 4-D

Mandatory Condominium & Cooperative Building Inspections and Non-Waivable Reserve Requirements | SENATE BILL 4-D

  • Posted: Mar 28, 2024
  • By:
  • Comments: Comments Off on Mandatory Condominium & Cooperative Building Inspections and Non-Waivable Reserve Requirements | SENATE BILL 4-D

Mandatory Condominium & Cooperative Building Inspections and Non-Waivable Reserve Requirements | SENATE BILL 4-D

brought to us by: REMBAUM’S ASSOCIATION ROUNDUP

We are getting so many calls from condo owners about inspections.  SFPMA thought why not re-post a great article about the inspections  what led up to this changes and what going forward are the requirements in Florida.  

With home insurers leaving Florida in droves, and following pressure from members of both political parties in the legislature to actually do something about it, in May 2022, the governor called a special legislative session to address the problem. A very real concern to the insurers is the effect of both time and inclement weather on Florida’s aging high-rise buildings. Until now, and for the most part, Florida law largely ignored these concerns. Enter Senate Bill 4-D (SB 4-D) which already became effective upon being signed into law by Governor DeSantis on May 26, 2022. This new piece of legislation addresses condominium and cooperative building inspections and reserve requirements (while this article primarily addresses these new laws in the context of condominium association application, they are equally applicable to cooperative associations).

By way of background, during the regular legislative session, there were several bills introduced in the Florida House of Representatives (House) and in the Florida Senate (Senate) addressing building safety issues, but none of them were passed into law due to the inability to match the language of the bills in both the House and the Senate which is a requirement for legislation to pass and go to the governor for consideration. As such, it was a little surprising to many observers that the legislature was able to approve SB 4-D in essentially a 48-hour window during the special session in May. The language used in SB 4-D was initially drafted into a proposed bill in November 2021. At that time, and during the most recent legislative session, input was provided by many industry professional groups including engineers, reserve study providers, and association attorneys. Many of these industry professionals indicated that there were challenges with some of the language and concepts being proposed in SB 4-D during session.

Notwithstanding these challenges, and in an effort to ensure some form of life safety legislation was passed this year, SB 4-D was unanimously approved in both the House and Senate and signed by the governor. A plain reading of this well intended, but in some instances not completely thought-out, legislation evidences these challenges. Some will say it is a good start that will need significant tweaking, which is expected during the 2023 Legislative Session. Others praise it, and yet others say it is an overreach of governmental authority, such as an inability to waive or reduce certain categories of reserves. You be the judge. We begin by examining the mandatory inspection and reserve requirements of SB 4-D.

I. MILESTONE INSPECTIONS: MANDATORY STRUCTURAL INSPECTIONS FOR CONDOMINIUM AND COOPERATIVE BUILDINGS. (§553.899, Fla. Stat.)

You will not find these new milestone inspection requirements in Chapters 718 or 719 of the Florida Statutes, but rather in Chapter 553, Florida Statutes, as cited above.

MILESTONE INSPECTIONS:

The term “milestone inspection” means a structural inspection of a building, including an inspection of load-bearing walls and the primary structural members and primary structural systems as those terms are defined in section 627.706, Florida Statutes, by a licensed architect or engineer authorized to practice in this state for the purposes of attesting to the life safety and adequacy of the structural components of the building and, to the extent reasonably possible, determining the general structural condition of the building as it affects the safety of such building, including a determination of any necessary maintenance, repair, or replacement of any structural component of the building. The purpose of such inspection is not to determine if the condition of an existing building is in compliance with the Florida Building Code or the fire safety code.

SUBSTANTIAL STRUCTURAL DETERIORATION:

The term “substantial structural deterioration” means substantial structural distress that negatively affects a building’s general structural condition and integrity. The term does not include surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage, or peeling of finishes unless the licensed engineer or architect performing the phase one or phase two inspection determines that such surface imperfections are a sign of substantial structural deterioration.

MILESTONE INSPECTIONS FOR BUILDINGS THREE STORIES OR MORE IN HEIGHT:

A condominium association under chapter 718 and a cooperative association under chapter 719 must have a milestone inspection performed for each building that is three stories or more in height by December 31 of the year in which the building reaches 30 years of age, based on the date the certificate of occupancy for the building was issued, and every 10 years thereafter.

WITHIN THREE MILES OF COASTLINE:

If the building is three or more stories in height and is located within three miles of a coastline, the condominium association or cooperative association must have a milestone inspection performed by December 31 of the year in which the building reaches 25 years of age, based on the date the certificate of occupancy for the building was issued, and every 10 years thereafter.

The condominium association or cooperative association must arrange for the milestone inspection to be performed and is responsible for ensuring compliance.

The condominium association or cooperative association is responsible for all costs associated with the inspection.

IF THE CERTIFICATE OF OCCUPANCY WAS ISSUED BEFORE JULY 1, 1992:

If a milestone inspection is required under this statute and the building’s certificate of occupancy was issued on or before July 1, 1992, the building’s initial milestone inspection must be performed before December 31, 2024. If the date of issuance for the certificate of occupancy is not available, the date of issuance of the building’s certificate of occupancy shall be the date of occupancy evidenced in any record of the local building official.

Upon determining that a building must have a milestone inspection, the local enforcement agency must provide written notice of such required inspection to the condominium association or cooperative association by certified mail, return receipt requested.

Within 180 days after receiving the written notice the condominium association or cooperative association must complete phase one of the milestone inspection. For purposes of this section, completion of phase one of the milestone inspection means the licensed engineer or architect who performed the phase one inspection submitted the inspection report by e-mail, United States Postal Service, or commercial delivery service to the local enforcement agency.

A MILESTONE INSPECTION CONSISTS OF TWO PHASES:

    (a) PHASE 1: For phase one of the milestone inspection, a licensed architect or engineer authorized to practice in this state must perform a visual examination of habitable and non-habitable areas of a building, including the major structural components of a building, and provide a qualitative assessment of the structural conditions of the building. If the architect or engineer finds no signs of substantial structural deterioration to any building components under visual examination, phase two of the inspection (discussed below) is not required. An architect or engineer who completes a phase one milestone inspection shall prepare and submit an inspection report.

    (b) PHASE 2: A phase two of the milestone inspection must be performed if any substantial structural deterioration is identified during phase one. A phase two inspection may involve destructive or nondestructive testing at the inspector’s direction. The inspection may be as extensive or as limited as necessary to fully assess areas of structural distress in order to confirm that the building is structurally sound and safe for its intended use and to recommend a program for fully assessing and repairing distressed and damaged portions of the building. When determining testing locations, the inspector must give preference to locations that are the least disruptive and most easily repairable while still being representative of the structure. An inspector who completes a phase two milestone inspection must prepare and submit an inspection report.

POST-MILESTONE INSPECTION REQUIREMENTS:

Upon completion of a phase one or phase two milestone inspection, the architect or engineer who performed the inspection must submit a sealed copy of the inspection report with a separate summary of, at minimum, the material findings and recommendations in the inspection report to the condominium association or cooperative association, and to the building official of the local government which has jurisdiction. The inspection report must, at a minimum, meet all of the following criteria:

(a) Bear the seal and signature, or the electronic signature, of the licensed engineer or architect who performed the inspection.

(b) Indicate the manner and type of inspection forming the basis for the inspection report.

(c) Identify any substantial structural deterioration within a reasonable professional probability based on the scope of the inspection, describe the extent of such deterioration, and identify any recommended repairs for such deterioration.

(d) State whether unsafe or dangerous conditions, as those terms are defined in the Florida Building Code, were observed

(e) Recommend any remedial or preventive repair for any items that are damaged but are not substantial structural deterioration

(f) Identify and describe any items requiring further inspection.

LOCAL GOVERNMENT ENFORCEMENT:

A local enforcement agency may prescribe time lines and penalties with respect to compliance with the milestone inspection requirements.

A board of county commissioners may adopt an ordinance requiring that a condominium or cooperative association schedule or commence repairs for substantial structural deterioration within a specified time frame after the local enforcement agency receives a phase two inspection report; however, such repairs must be commenced within 365 days after receiving such report. If an association fails to submit proof to the local enforcement agency that repairs have been scheduled or have commenced for substantial structural deterioration identified in a phase two inspection report within the required time frame, the local enforcement agency must review and determine if the building is unsafe for human occupancy.

BOARD’S DUTY AFTER OBTAINING THE MILESTONE REPORT:

Upon completion of a phase one or phase two milestone inspection and receipt of the inspector-prepared summary of the inspection report from the architect or engineer who performed the inspection, the association must distribute a copy of the inspector-prepared summary of the inspection report to each unit owner, regardless of the findings or recommendations in the report, by United States mail or personal delivery and by electronic transmission to unit owners who previously consented to receive notice by electronic transmission; must post a copy of the inspector-prepared summary in a conspicuous place on the condominium or cooperative property; and must publish the full report and inspector-prepared summary on the association’s website, if the association is required to have a website.

WHO PAYS FOR THE MILESTONE INSPECTION:

Pursuant to section 718.112, Florida Statutes, if an association is required to have a milestone inspection performed, the association must arrange for the milestone inspection to be performed and is responsible for ensuring compliance with all of the requirements thereof. The association is responsible for all costs associated with the inspection.

FAILURE TO OBTAIN THE MILESTONE INSPECTION:

If the officers or directors of an association willfully and knowingly fail to have a milestone inspection performed pursuant to section 553.899, Florida Statutes, such failure is a breach of the officers’ and directors’ fiduciary relationship to the unit owners.

MANAGER’S DUTY:

If a community association manager or a community association management firm has a contract with a community association that has a building on the association’s property that is subject to milestone inspection, the community association manager or the community association management firm must comply with the requirements of performing such inspection as directed by the board.

EXEMPTIONS:

For clarity, the otherwise required milestone inspection does not apply to a single family, two-family, or three-family dwelling with three or fewer habitable stories above ground.

FLORIDA BUILDING COMMISSION REQUIREMENTS:

The Florida Building Commission must review the milestone inspection requirements and make recommendations, if any, to the legislature to ensure inspections are sufficient to determine the structural integrity of a building. The commission must provide a written report of any recommendations to the Governor, the President of the Senate, and the Speaker of the House of Representatives by December 31, 2022.

The Florida Building Commission must consult with the State Fire Marshal to provide recommendations to the legislature for the adoption of comprehensive structural and life safety standards for maintaining and inspecting all types of buildings and structures in this state that are three stories or more in height. The commission must provide a written report of its recommendations to the Governor, the President of the Senate and the Speaker of the House of Representatives by December 31, 2023.

II.    STRUCTURAL INTEGRITY RESERVE STUDIES AND MANDATORY RESERVES:

The reserve legislation set out in section 718.112 (f)(2)(a), Florida Statutes, is, for all intents and purposes, re-written. Prior to examining these most recent revisions, it is necessary to first examine the definitions set out in section 718.103, Florida Statutes, where a brand new term is added as follows:

Structural integrity reserve study means a study of the reserve funds required for future major repairs and replacement of the common areas based on a visual inspection of the common areas applicable to all condominiums and cooperative buildings 3 stories or higher.

Hereafter, the structural integrity reserve study is referred to as “SIRS”. Now we can turn our attention to the requirements of the SIRS as set out in section 718.112 (f)(2)(a), Florida Statutes

THE STRUCTURAL INTEGRITY RESERVE STUDY (required for all condominium and cooperative buildings three stories or higher regardless of date of certificate of occupancy):

An association must have a SIRS completed at least every 10 years after the condominium’s creation for each building on the condominium property that is three stories or higher in height which includes, at a minimum, a study of the following items as related to the structural integrity and safety of the building:

a. Roof
b. Load-bearing walls or other primary structural members
c. Floor
d. Foundation
e. Fireproofing and fire protection systems
f.  Plumbing
g. Electrical systems
h. Waterproofing and exterior painting
i.  Windows
j. Any other item that has a deferred maintenance expense or replacement cost that exceeds $10,000 and the failure to replace or maintain such item negatively affects the items listed in subparagraphs a.-i., as determined by the licensed engineer or architect performing the visual inspection portion of the structural integrity reserve study.

The SIRS may be performed by any person qualified to perform such study. However, the visual inspection portion of the structural integrity reserve study MUST be performed by an engineer licensed under chapter 471 or an architect licensed under chapter 481.

As further set out in the legislation, at a minimum, “a structural integrity reserve study must identify the common areas being visually inspected, state the estimated remaining useful life and the estimated replacement cost or deferred maintenance expense of the common areas being visually inspected, and provide a recommended annual reserve amount that achieves the estimated replacement cost or deferred maintenance expense of each common area being visually inspected by the end of the estimated remaining useful life of each common area.”

The amount to be reserved for an item is determined by the association’s most recent structural integrity reserve study that must be completed by December 31, 2024. If the amount to be reserved for an item is not in the association’s initial or most recent structural integrity reserve study or the association has not completed a structural integrity reserve study, the amount must be computed using a formula based upon estimated remain useful life and estimated replacement cost or deferred maintenance expense of each reserve item.

If the condominium building is less than three stories then the legislation provides that, “in addition to annual operating expenses, the budget must include reserve accounts for capital expenditures and deferred maintenance. These accounts must include, but are not limited to, roof replacement, building painting, and pavement resurfacing, regardless of the amount of deferred maintenance expense or replacement cost, and any other item that has a deferred maintenance expense or replacement cost that exceeds $10,000.”

The association may adjust replacement reserve assessments annually to take into account any changes in estimates or extension of the useful life of a reserve item caused by deferred maintenance.

If an association fails to complete a SIRS, such failure is a breach of an officer’s and director’s fiduciary relationship to the unit owners.

NON-WAIVABLE AND WAIVABLE RESERVES IN THE UNIT OWNER CONTROLLED ASSOCIATION:

As to the SIRS, the legislation is patently clear that unit owners may not vote for no reserves or lesser reserves for items set forth SIRS report. There is on-going debate amongst attorneys in regard to whether a condominium under three stories can waive or reduce reserves for any of the reserve items required to be in the SIRS that are included in the under three story condominium reserve, for example, roof and painting (For those interested, examine lines 1029 to 1033 and 1050 to 1071 in SB 4-D).

MANDATORY RESERVES IN THE DEVELOPER CONTROLLED ASSOCIATION:

Before turnover of control of an association by a developer to unit owners other than a developer pursuant to section 718.301, Florida Statutes, the developer-controlled association may not vote to waive the reserves or reduce the funding of the reserves (Previously, a developer could fully waive all reserves for the first two years, meaning this is a monumental change).

PRE-TURNOVER DEVELOPER DUTY:

Before a developer turns over control of an association to unit owners other than the developer, the developer must have a SIRS completed for each building on the condominium property that is three stories or higher in height.

III.    OFFICIAL RECORDS:

Official records of the condominium and cooperative association include structural integrity reserve studies, financial reports of the association or condominium, and a copy of the inspection reports and any other inspection report relating to a structural or life safety inspection of condominium or cooperative property.

In addition to the right to inspect and copy the declaration, bylaws and rules renters have the right to inspect the milestone inspection report and structural integrity reserve study inspection reports as well.

Structural integrity reserve studies must be maintained for at least 15 years after the study is completed. In addition, inspection reports report and any other inspection report relating to a structural or life safety inspection of condominium property must be maintained for 15 years after receipt of such report.

IV.    ASSOCIATION WEBSITES:

In addition to other positing requirements, the inspection reports described above and any other inspection report relating to a structural or life safety inspection of condominium property and the association’s most recent structural integrity reserve study must be posted to the website.

V.    JURISDICTION OF DIVISION OF CONDOMINIUMS, TIMESHARES, AND MOBILE HOMES:

Pre-turnover, the Division of Florida Condominiums, Timeshares, and Mobile Homes (Division) may enforce and ensure compliance with rules relating to the development, construction, sale, lease, ownership, operation, and management of residential condominium units, and complaints related to the procedural completion of milestone inspections. After turnover has occurred, the Division has jurisdiction to investigate complaints related only to financial issues, elections, and the maintenance of and unit owner access to association records, and the procedural completion of structural integrity reserve studies.

VI. NEW REPORTING REQUIREMENTS FOR ALL CONDOMINIUM AND COOPERATIVE ASSOCIATIONS:

On or before January 1, 2023, condominium associations existing on or before July 1, 2022, must provide the following information to the Division in writing, by e-mail, United States Postal Service, commercial delivery service, or hand delivery, at a physical address or e-mail address provided by the division and on a form posted on the division’s website:

    1. The number of buildings on the condominium property that are three stories or higher in height.
    2. The total number of units in all such buildings.
    3. The addresses of all such buildings.
    4. The counties in which all such buildings are located.

An association must provide an update in writing to the division if there are any changes to the information in the list within six months after the change.

VII.    APPLICABLE TO ALL SELLERS OF UNITS:

As a part of the sales process, the seller of a condominium or cooperative unit and developers must provide to potential purchasers a copy of the inspector-prepared summary of the milestone inspection report and a copy of the association’s most recent structural integrity reserve study or a statement that the association has not completed a structural integrity reserve study.

VIII.    GLITCHES:

As with any new legislation of such a substantial nature, there often follow in subsequent years what are referred to as “glitch bills” which help provide additional clarity, remove ambiguity, and fix unintended errors. To name a few: (i) the term “common areas” is used in the legislation when in fact the correct term is “common element;” (ii) clarity needs to be provided regarding whether reserve items that are required to be in SIRS, but show up in the under three story reserves, such as paint and paving, can be waived or reduced by the membership; and (iii) for those buildings that are within three miles of the coastline, additional clarity could be provided to provide better guidance as to how to perform the measurement.

 

 

 

Tags: ,
Maximizing the value and life cycle of a building requires continuously maintaining performance and improving energy efficiency Learn how Rimkus can help with your Building Inspections & Repair.

Maximizing the value and life cycle of a building requires continuously maintaining performance and improving energy efficiency Learn how Rimkus can help with your Building Inspections & Repair.

Building Envelope Services

Maximizing the value and life cycle of a building requires continuously maintaining performance and improving energy efficiency Learn how Rimkus can help with your Building Inspections & Repair.

From the design of new buildings to the construction materials and technologies used to repair and maintain existing structures, we are uniquely qualified to provide a full range of global building envelope consulting services to help prevent and eliminate problems.

Performance for the Life Cycle of Your Project

Committed to utilizing sustainable materials and methods as applicable, we proactively address performance issues to improve the way buildings are constructed and maintained.

 

View our building envelope services:

  • Building Envelope Assessments
  • Façade Inspections
  • Façade Restoration
  • Historic Preservation
  • Pavement Engineering
  • Roof Consulting
  • Waterproofing and Weatherproofing Assessments and Design

 

Building Envelope Assessments

The Rimkus Built Environment Solutions team can provide a complete assessment of a structure’s building envelope (façades, roofs, windows, balconies, walkways, parking areas, etc.) describing the condition of such and all items in need of repair. A recommended timeline and a projected construction cost will also be provided to assist the owner in projecting future budgets. For a full survey of all building components, Rimkus can increase the scope of the survey and provide a full Property Condition Assessment (PCA) including mechanical, electrical and plumbing systems, elevators, and interiors. Building envelope assessments and PCAs are typically provided with 5- or 10-year projections; however, they may be customized to the client’s needs. These reports can be utilized as a tool to help create capital expenditure budgets and establish maintenance schedules.

Contract Administration

Retaining Rimkus to handle your Contract Administration services on your roof construction projects will provide you with seasoned professionals who know how to control costs and long term outcomes. You will experience greatly improved transparency and accountability from your contractors and you will also be far more likely to maintain critical schedules, budgets, and deadlines on your projects. Rimkus achieves these benefits by maintaining a free flow of information between the Contractor and Owner. Our services also include payment certification and preparation of change orders for any additional work that may be encountered during the course of the project. We strive to protect our clients by confirming that the solutions you invest in meet all of your roofing and building portfolio needs. At Rimkus, you will find a level of personal attention on every project that is unmatched by any of our competitors. Trust in our veteran team, state-of-the-art technology, and our decades of experience in the industry. We offer:

  • Contract Administration
  • Schedule, budget, and deadline maintenance
  • Minimization of building occupant disruptions
  • Payment certification
  • Preparation of change orders
  • Review of shop drawings / material submissions

 

Diagnostic Testing

To properly assess the condition of your roof we need to determine its composition, quality, and moisture content. At Rimkus, we can accurately assess each of those factors with our Destructive and Non-Destructive Testing protocols. It is one of the steps taken during your Roof Condition Analysis and a necessary tool in projecting the life expectancy and long-term costs of your roof. We can also use the results to save you money by identifying problems before they become catastrophic. We strive to protect our clients by confirming that the solutions you invest in meet all of your roofing and building portfolio needs. At Rimkus, you will find a level of personal attention on every project that is unmatched by any of our competitors. You can place your trust in our veteran team, state-of-the-art technology, and our decades of experience in the industry.

We offer a variety of diagnostic testing methods:

  • Infrared thermography
  • Tramex moisture meter
  • Electrical Field Vector Mapping (EFVM)
  • Core cut testing
  • Delmhorst Probe

 

Façade Inspections

When façade elements fail, components could fall, thereby putting people and property at risk. As a response to this, many cities have passed façade ordinances to identify unsafe conditions, such as loose façade components or materials that may fall and cause damage to property or injury to pedestrians. At Rimkus, we provide professional building inspections supported by recommendations and design for proactive maintenance and repair programs. Façade inspections typically fall into one of the following categories:

  • Safe: Requires no attention
  • Safe with a Repair and Maintenance Program: Requires repairs or maintenance within a time period designated by the professional in order to prevent deterioration into an unsafe condition
  • Unsafe: Has no reliable means of structural support and is dangerous to persons or property. Requires prompt remedial action.

Conducting Inspections Inspection requirements range from visual inspection of street-facing façades by architects, engineers, or contractors, to “hands-on inspections” that require licensed engineers or architects to physically touch façade components for each elevation of the building along the entire height of each elevation. Typically, inspections are required for buildings over five stories, with inspection frequencies ranging from two to five years. Our experts are well versed in façade condition assessments and have the experience and knowledge needed to identify repair details as well as oversee the completion of the repairs on behalf of the property owner.

Façade Restoration

The appurtenances of a façade (balconies, fire escapes, etc.) often deteriorate faster than the façade itself and therefore require particular attention and, often, increased maintenance. Repairs to these elements should be addressed in a manner that will prolong the useful life of the appurtenance as well as the repairs performed. The Rimkus Building Envelope team can assist in all phases of façade restoration. We are well versed in façade restoration, with a long track record of success on projects varying from low-rise commercial and residential buildings to luxury high-rise towers. The façade, while best known for its aesthetic, also provides structural support for a building and vertical weatherproofing for its interior spaces. All three of these components should be analyzed during façade restoration. Performing a thorough analysis of the building’s façade prior to design, Rimkus provides a detailed list of findings and recommendations for immediate repairs as well as preventative maintenance to completely address façade functions. At Rimkus, we believe that the key to a successful façade restoration project often occurs before the contractor arrives on-site. A thorough and detailed pre-construction effort, including preliminary investigation, preparation of contract documents, bid process and review, pre-construction meeting(s), and review of all mock-ups and submittals, will often eliminate unnecessary costs and construction delays.

Historic Preservation

Rimkus has had the distinct pleasure of working on numerous historic and landmark structures, including both high-rise and low-rise office buildings as well as a number of ornate residential buildings. Exhaustive research, early coordination with all governing agencies, and involvement of qualified experienced professionals are all essential components in the preservation of these delicate historic structures. When analyzing and repairing the building envelope of historic structures a conservationist perspective is preferable, full-scale repair or replacement is not always best. Thorough documentation of existing conditions including sketches, photographs, and cataloging of deteriorated elements is imperative to the restoration process. The use of new technologies to eliminate unnecessary probes and demolition is advisable. By incorporating the use of laser scanning, Rimkus can achieve an unprecedented level of detail and accuracy during the design phase often without the need for hands-on visual inspections. In addition to providing thorough contract documents; these laser scans will allow for the creation of 3D models of decorative stone units for shop drawings and mold casting.

Leak Investigations

Rimkus offers a thorough approach to leak investigations, recognizing that a successful investigation requires pursuing all possible sources of water infiltration. With years of experience, Rimkus understands that there may be multiple factors contributing to a leak. Rimkus offers a range of services to assist in determining the source(s) of water infiltration, including hands-on and visual inspections, non-destructive testing techniques, and more traditional methods of probes and water tests. Our non-destructive testing techniques include the use of infrared imaging to identify thermal anomalies and moisture-compromised insulation, the use of roof and wall moisture scanners and moisture meters to perform impedance testing and identify the relative moisture content of the material, and electronic leak detection (electric field vector mapping) to identify the precise location of water infiltration.

Roof Condition Assessments

Rimkus recommends a roof condition assessment to better understand the life expectancy of a roof and to address an immediate concern. The result is a promptly delivered roof analysis outlining the strengths and weaknesses of the existing roof system. Our findings are put into a clear and legible report that includes photo evidence, illustrations, and a colored AutoCAD roof plan. We believe that a high level of clarity and transparency is crucial to help our clients make informed decisions. Many of our technicians are RCI Inc., RRC, and RRO certified. Our emergency leak responders can diagnose numerous problems on the spot and expedite the remediation strategy. Capital planning is also an important component that we provide as part this process. We believe it is important to provide our clients with a strategy for future investments and expenditures to meet both the short and long-term budget plans.

Waterproofing and Weatherproofing Assessments and Design

Rimkus assists in the evaluation of existing roofing/waterproofing systems, as well as the design and construction administration of the repair or replacement, of all roofing/waterproofing systems including:

  • Single Ply (Thermoset and Thermoplastic) Systems
  • Modified Bitumen Roof Systems
  • Fluid-Applied Liquid Membranes
  • Vegetative/Green Roofs
  • Balcony Waterproofing
  • Below-Grade and Sidewalk Vault Waterproofing

Similar to most aspects of construction one size, does not fit all with respect to roofing and waterproofing systems. Several factors determine the appropriate system for a particular building, including:

  • Building Code Regulations
  • Requirements of Owner’s Insurance Provider
  • Climate and Wind/Weather Exposure
  • Frequency and Type of Foot Traffic
  • Intended Use (of Roof Surface and Interior Space Below)
  • Mechanical Equipment and Exhaust Units
  • Overall Size
  • Roof Slope
  • Desired Life Expectancy
  • Owner’s Budget
  • Number of Penetrations
  • Roof Deck Composition

Several commonly overlooked processes can be established during the installation of a new roof that will help reduce the cost of future maintenance and extend the service life of the roof system:

Leak detection systems can be installed in most roof systems to use as a quality assurance tool and to allow for easy identification of future leaks. This is particularly important in roofs with an overburden (i.e., inverted roof systems and vegetative roofs). A custom-tailored roof inspection and maintenance schedule should be provided for the owner’s use in prolonging the useful life of the roof system and minimizing the risk of leaks resulting from roof damage.

General Contact Information

 


Tags: , , ,
We’re using AI to answer all your questions about Florida’s condo safety law SB-4D.

We’re using AI to answer all your questions about Florida’s condo safety law SB-4D.

  • Posted: Feb 26, 2024
  • By:
  • Comments: Comments Off on We’re using AI to answer all your questions about Florida’s condo safety law SB-4D.
We’re using AI to answer all your questions about Florida’s condo safety law SB-4D.
+ What are the components of a structural integrity reserve study?
+ What is substantial structural deterioration?
+ Can my community waive reserves?
+ Do requirements per SB-4D apply to parking garages?
Get answers to these questions and more on our “AI for Building Safety” webpage. Check it out!

Ask our AI about 4D

Do you have questions about Florida’s building safety legislation, Senate Bill 4D? Just enter your query in the textbox below and click “Send Query”. For example, try asking, “What is the Florida Senate Bill 4D?”. This AI tool is experimental and provides no warranties regarding the accuracy of its results. Use at your own risk.

 

Tags: , ,
The Falcon Group – An industry-leader providing professional, cost effective and innovative architectural and engineering designs, solutions and services through the use of highly qualified staff and outstanding customer service.

The Falcon Group – An industry-leader providing professional, cost effective and innovative architectural and engineering designs, solutions and services through the use of highly qualified staff and outstanding customer service.

The Falcon Group is an industry-leader providing professional, cost effective and innovative architectural and engineering designs, solutions and services through the use of highly qualified staff and outstanding customer service.

Our structural engineers will design, plan and execute your project, tailored to suit each individual’s specific needs and budgets. Our engineers will inspect all materials used to ensure the strength and stability of your structure from low-, mid-, to high-rise structures and facilities. Falcon’s engineers pride themselves on ensuring the services and recommendations provided to each of our clients are held at the desired level of individualized care and attention.

  • High Rise & Mid Rise Façade Inspections & Repair/Restoration/Replacement

  • Stucco & Exterior Insulation Finish Systems (EIFS) Evaluations & Repair

  • Mid Rise & Low Rise Siding Inspections & Repair Replacement

  • Roof Inspections & Repair/Replacement

  • Water Infiltration Investigation & Remediation

  • Window & Door Replacement Design

  • Balcony & Deck Repair/Restoration/Replacement

  • Foundation Inspections & Waterproofing

  • Firewall / Fire Separation Assembly Inspections & Remediation

 


View our new brochure, learn how we can help you with the services we provide. 

Falcon-Florida Brochure

MIAMI
15405 NW 7th Avenue in Miami, FL 33169
Phone: 305-663-1970
marketing@thefalcongroup.us
WEST PALM BEACH, FLORIDA
5651 Corporate Way, Suite 4, West Palm Beach, Florida 33407
Phone: 561-290-0504
marketing@thefalcongroup.us
TAMPA BAY
1211 1st Avenue, N., Suite #106, St. Petersburg, FL 33705
Phone: 813-438-3568
marketing@thefalcongroup.us
Tags: , , ,