Become a Member: JOIN SFPMA TODAY   LogIn / Register: LOGIN/REGISTER

SFPMA Industry Articles | news, legal updates, events & education! 

Find Blog Articles for Florida’s Condo, HOA and the Management Industry. 

Condo HOA Loans: We can assist you in obtaining the necessary funds for Projects, Reserves, or Cash Flow.

Condo HOA Loans: We can assist you in obtaining the necessary funds for Projects, Reserves, or Cash Flow.

  • Posted: Oct 23, 2024
  • By:
  • Comments: 0

Condo HOA Loans

We can assist you in obtaining the necessary funds for Projects Reserves or Cash Flow.

Your Trusted Community Association Financial Resource

 

Don’t go it alone. Whether your Community requires Conventional or Private Lending, CondoHOALoans can assist you in obtaining the necessary funds for Projects, Reserves, or Cash Flow.

When your Community Association works with our Law Firm to facilitate and secure financing, your Community will also have the optional benefit of receiving 100% FREE Delinquent Account Collection Services.

Not sure if financing is right for your Association? Download the Association Funding Options Infographic and take our Free Financial Health Survey to find out.

 


Take the Free Financial Health Survey

Completing this Survey will provide you with a written report you will be able to immediately download upon completion.

Take Our FREE Financial Health Survey

 


Association Funding Options

Getting started with CondoHOALoans is easy.

We’ll help your community identify funding resources and lending options for all of its financial needs. Our Legal Services to your community do not end at the successful closing of your loan with the Lender of YOUR choice. As a valued client of Katzman Chandler, you will have the option, but not the obligation, to have ALL future delinquent accounts collected for FREE.

 

The Condo Building Maintenance Crisis in Florida

As a consequence of hurricanes, business cycles, and fluctuations in the real estate market over the last 20 years, financial distress has been caused to those who live in Community Associations as well as the Communities Association entities themselves.  There presently exist hundreds (if not thousands) of communities whose stories can be illustrated by the timeline below.

Many of these communities presently have underfunded budgets, inadequate cash flow, and lack adequate reserves to accomplish necessary preventative maintenance and actual present maintenance needs. Overall, Boards are starting to realize that there is a lot to do, with little or no money to do it.

 

CondoHOALoans is the best solution for customized, competitive lending options.
Download the Infographic to learn more.

(833) 427-3863

Tags: , ,
MANDATORY CONDOMINIUM & COOPERATIVE BUILDING INSPECTIONS & NON-WAIVABLE RESERVE REQUIREMENTS SENATE BILL 4-D

MANDATORY CONDOMINIUM & COOPERATIVE BUILDING INSPECTIONS & NON-WAIVABLE RESERVE REQUIREMENTS SENATE BILL 4-D

  • Posted: Oct 23, 2024
  • By:
  • Comments: Comments Off on MANDATORY CONDOMINIUM & COOPERATIVE BUILDING INSPECTIONS & NON-WAIVABLE RESERVE REQUIREMENTS SENATE BILL 4-D

MANDATORY CONDOMINIUM & COOPERATIVE BUILDING INSPECTIONS & NON-WAIVABLE RESERVE REQUIREMENTS

We are reposting this, for all the buildings That have not had inspections…..

SENATE BILL 4-D

With home insurers leaving Florida in droves, and following pressure from members of both political parties in the legislature to actually do something about it, in May 2022, the governor called a special legislative session to address the problem. A very real concern to the insurers is the effect of both time and inclement weather on Florida’s aging high-rise buildings. Until now, and for the most part, Florida law largely ignored these concerns. Enter Senate Bill 4-D (SB 4-D) which already became effective upon being signed into law by Governor DeSantis on May 26, 2022. This new piece of legislation addresses condominium and cooperative building inspections and reserve requirements (while this article primarily addresses these new laws in the context of condominium association application, they are equally applicable to cooperative associations).

By way of background, during the regular legislative session, there were several bills introduced in the Florida House of Representatives (House) and in the Florida Senate (Senate) addressing building safety issues, but none of them were passed into law due to the inability to match the language of the bills in both the House and the Senate which is a requirement for legislation to pass and go to the governor for consideration. As such, it was a little surprising to many observers that the legislature was able to approve SB 4-D in essentially a 48-hour window during the special session in May. The language used in SB 4-D was initially drafted into a proposed bill in November 2021. At that time, and during the most recent legislative session, input was provided by many industry professional groups including engineers, reserve study providers, and association attorneys. Many of these industry professionals indicated that there were challenges with some of the language and concepts being proposed in SB 4-D during session.

Notwithstanding these challenges, and in an effort to ensure some form of life safety legislation was passed this year, SB 4-D was unanimously approved in both the House and Senate and signed by the governor. A plain reading of this well intended, but in some instances not completely thought-out, legislation evidences these challenges. Some will say it is a good start that will need significant tweaking, which is expected during the 2023 Legislative Session. Others praise it, and yet others say it is an overreach of governmental authority, such as an inability to waive or reduce certain categories of reserves. You be the judge. We begin by examining the mandatory inspection and reserve requirements of SB 4-D.

I. MILESTONE INSPECTIONS: MANDATORY STRUCTURAL INSPECTIONS FOR CONDOMINIUM AND COOPERATIVE BUILDINGS. (§553.899, Fla. Stat.)

You will not find these new milestone inspection requirements in Chapters 718 or 719 of the Florida Statutes, but rather in Chapter 553, Florida Statutes, as cited above.

MILESTONE INSPECTIONS:

The term “milestone inspection” means a structural inspection of a building, including an inspection of load-bearing walls and the primary structural members and primary structural systems as those terms are defined in section 627.706, Florida Statutes, by a licensed architect or engineer authorized to practice in this state for the purposes of attesting to the life safety and adequacy of the structural components of the building and, to the extent reasonably possible, determining the general structural condition of the building as it affects the safety of such building, including a determination of any necessary maintenance, repair, or replacement of any structural component of the building. The purpose of such inspection is not to determine if the condition of an existing building is in compliance with the Florida Building Code or the fire safety code.

SUBSTANTIAL STRUCTURAL DETERIORATION:

The term “substantial structural deterioration” means substantial structural distress that negatively affects a building’s general structural condition and integrity. The term does not include surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage, or peeling of finishes unless the licensed engineer or architect performing the phase one or phase two inspection determines that such surface imperfections are a sign of substantial structural deterioration.

MILESTONE INSPECTIONS FOR BUILDINGS THREE STORIES OR MORE IN HEIGHT:

A condominium association under chapter 718 and a cooperative association under chapter 719 must have a milestone inspection performed for each building that is three stories or more in height by December 31 of the year in which the building reaches 30 years of age, based on the date the certificate of occupancy for the building was issued, and every 10 years thereafter.

WITHIN THREE MILES OF COASTLINE:

If the building is three or more stories in height and is located within three miles of a coastline, the condominium association or cooperative association must have a milestone inspection performed by December 31 of the year in which the building reaches 25 years of age, based on the date the certificate of occupancy for the building was issued, and every 10 years thereafter.

The condominium association or cooperative association must arrange for the milestone inspection to be performed and is responsible for ensuring compliance.

The condominium association or cooperative association is responsible for all costs associated with the inspection.

IF THE CERTIFICATE OF OCCUPANCY WAS ISSUED BEFORE JULY 1, 1992:

If a milestone inspection is required under this statute and the building’s certificate of occupancy was issued on or before July 1, 1992, the building’s initial milestone inspection must be performed before December 31, 2024. If the date of issuance for the certificate of occupancy is not available, the date of issuance of the building’s certificate of occupancy shall be the date of occupancy evidenced in any record of the local building official.

Upon determining that a building must have a milestone inspection, the local enforcement agency must provide written notice of such required inspection to the condominium association or cooperative association by certified mail, return receipt requested.

Within 180 days after receiving the written notice the condominium association or cooperative association must complete phase one of the milestone inspection. For purposes of this section, completion of phase one of the milestone inspection means the licensed engineer or architect who performed the phase one inspection submitted the inspection report by e-mail, United States Postal Service, or commercial delivery service to the local enforcement agency.

A MILESTONE INSPECTION CONSISTS OF TWO PHASES:

    (a) PHASE 1: For phase one of the milestone inspection, a licensed architect or engineer authorized to practice in this state must perform a visual examination of habitable and non-habitable areas of a building, including the major structural components of a building, and provide a qualitative assessment of the structural conditions of the building. If the architect or engineer finds no signs of substantial structural deterioration to any building components under visual examination, phase two of the inspection (discussed below) is not required. An architect or engineer who completes a phase one milestone inspection shall prepare and submit an inspection report.

    (b) PHASE 2: A phase two of the milestone inspection must be performed if any substantial structural deterioration is identified during phase one. A phase two inspection may involve destructive or nondestructive testing at the inspector’s direction. The inspection may be as extensive or as limited as necessary to fully assess areas of structural distress in order to confirm that the building is structurally sound and safe for its intended use and to recommend a program for fully assessing and repairing distressed and damaged portions of the building. When determining testing locations, the inspector must give preference to locations that are the least disruptive and most easily repairable while still being representative of the structure. An inspector who completes a phase two milestone inspection must prepare and submit an inspection report.

POST-MILESTONE INSPECTION REQUIREMENTS:

Upon completion of a phase one or phase two milestone inspection, the architect or engineer who performed the inspection must submit a sealed copy of the inspection report with a separate summary of, at minimum, the material findings and recommendations in the inspection report to the condominium association or cooperative association, and to the building official of the local government which has jurisdiction. The inspection report must, at a minimum, meet all of the following criteria:

    (a) Bear the seal and signature, or the electronic signature, of the licensed engineer or architect who performed the inspection.

    (b) Indicate the manner and type of inspection forming the basis for the inspection report.

    (c) Identify any substantial structural deterioration within a reasonable professional probability based on the scope of the inspection, describe the extent of such deterioration, and identify any recommended repairs for such deterioration.

    (d) State whether unsafe or dangerous conditions, as those terms are defined in the Florida Building Code, were observed.

    (e) Recommend any remedial or preventive repair for any items that are damaged but are not substantial structural deterioration.

(f) Identify and describe any items requiring further inspection.

LOCAL GOVERNMENT ENFORCEMENT:

A local enforcement agency may prescribe time lines and penalties with respect to compliance with the milestone inspection requirements.

A board of county commissioners may adopt an ordinance requiring that a condominium or cooperative association schedule or commence repairs for substantial structural deterioration within a specified time frame after the local enforcement agency receives a phase two inspection report; however, such repairs must be commenced within 365 days after receiving such report. If an association fails to submit proof to the local enforcement agency that repairs have been scheduled or have commenced for substantial structural deterioration identified in a phase two inspection report within the required time frame, the local enforcement agency must review and determine if the building is unsafe for human occupancy.

BOARD’S DUTY AFTER OBTAINING THE MILESTONE REPORT:

Upon completion of a phase one or phase two milestone inspection and receipt of the inspector-prepared summary of the inspection report from the architect or engineer who performed the inspection, the association must distribute a copy of the inspector-prepared summary of the inspection report to each unit owner, regardless of the findings or recommendations in the report, by United States mail or personal delivery and by electronic transmission to unit owners who previously consented to receive notice by electronic transmission; must post a copy of the inspector-prepared summary in a conspicuous place on the condominium or cooperative property; and must publish the full report and inspector-prepared summary on the association’s website, if the association is required to have a website.

WHO PAYS FOR THE MILESTONE INSPECTION:

Pursuant to section 718.112, Florida Statutes, if an association is required to have a milestone inspection performed, the association must arrange for the milestone inspection to be performed and is responsible for ensuring compliance with all of the requirements thereof. The association is responsible for all costs associated with the inspection.

FAILURE TO OBTAIN THE MILESTONE INSPECTION:

If the officers or directors of an association willfully and knowingly fail to have a milestone inspection performed pursuant to section 553.899, Florida Statutes, such failure is a breach of the officers’ and directors’ fiduciary relationship to the unit owners.

MANAGER’S DUTY:

If a community association manager or a community association management firm has a contract with a community association that has a building on the association’s property that is subject to milestone inspection, the community association manager or the community association management firm must comply with the requirements of performing such inspection as directed by the board.

EXEMPTIONS:

For clarity, the otherwise required milestone inspection does not apply to a single family, two-family, or three-family dwelling with three or fewer habitable stories above ground.

FLORIDA BUILDING COMMISSION REQUIREMENTS:

The Florida Building Commission must review the milestone inspection requirements and make recommendations, if any, to the legislature to ensure inspections are sufficient to determine the structural integrity of a building. The commission must provide a written report of any recommendations to the Governor, the President of the Senate, and the Speaker of the House of Representatives by December 31, 2022.

The Florida Building Commission must consult with the State Fire Marshal to provide recommendations to the legislature for the adoption of comprehensive structural and life safety standards for maintaining and inspecting all types of buildings and structures in this state that are three stories or more in height. The commission must provide a written report of its recommendations to the Governor, the President of the Senate and the Speaker of the House of Representatives by December 31, 2023.

II.    STRUCTURAL INTEGRITY RESERVE STUDIES AND MANDATORY RESERVES:

The reserve legislation set out in section 718.112 (f)(2)(a), Florida Statutes, is, for all intents and purposes, re-written. Prior to examining these most recent revisions, it is necessary to first examine the definitions set out in section 718.103, Florida Statutes, where a brand new term is added as follows:

    Structural integrity reserve study means a study of the reserve funds required for future major repairs and replacement of the common areas based on a visual inspection of the common areas applicable to all condominiums and cooperative buildings 3 stories or higher.

Hereafter, the structural integrity reserve study is referred to as “SIRS”. Now we can turn our attention to the requirements of the SIRS as set out in section 718.112 (f)(2)(a), Florida Statutes

THE STRUCTURAL INTEGRITY RESERVE STUDY (required for all condominium and cooperative buildings three stories or higher regardless of date of certificate of occupancy):

An association must have a SIRS completed at least every 10 years after the condominium’s creation for each building on the condominium property that is three stories or higher in height which includes, at a minimum, a study of the following items as related to the structural integrity and safety of the building:

a.     Roof.

b. Load-bearing walls or other primary structural members.

c. Floor.

d. Foundation.

e. Fireproofing and fire protection systems.

f. Plumbing.

g. Electrical systems.

h. Waterproofing and exterior painting.

i.  Windows.

j. Any other item that has a deferred maintenance expense or replacement cost that exceeds $10,000 and the failure to replace or maintain such item negatively affects the items listed in subparagraphs a.-i., as determined by the licensed engineer or architect performing the visual inspection portion of the structural integrity reserve study.

The SIRS may be performed by any person qualified to perform such study. However, the visual inspection portion of the structural integrity reserve study MUST be performed by an engineer licensed under chapter 471 or an architect licensed under chapter 481.

As further set out in the legislation, at a minimum, “a structural integrity reserve study must identify the common areas being visually inspected, state the estimated remaining useful life and the estimated replacement cost or deferred maintenance expense of the common areas being visually inspected, and provide a recommended annual reserve amount that achieves the estimated replacement cost or deferred maintenance expense of each common area being visually inspected by the end of the estimated remaining useful life of each common area.”

The amount to be reserved for an item is determined by the association’s most recent structural integrity reserve study that must be completed by December 31, 2024. If the amount to be reserved for an item is not in the association’s initial or most recent structural integrity reserve study or the association has not completed a structural integrity reserve study, the amount must be computed using a formula based upon estimated remain useful life and estimated replacement cost or deferred maintenance expense of each reserve item.

If the condominium building is less than three stories then the legislation provides that, “in addition to annual operating expenses, the budget must include reserve accounts for capital expenditures and deferred maintenance. These accounts must include, but are not limited to, roof replacement, building painting, and pavement resurfacing, regardless of the amount of deferred maintenance expense or replacement cost, and any other item that has a deferred maintenance expense or replacement cost that exceeds $10,000.”

The association may adjust replacement reserve assessments annually to take into account any changes in estimates or extension of the useful life of a reserve item caused by deferred maintenance.

If an association fails to complete a SIRS, such failure is a breach of an officer’s and director’s fiduciary relationship to the unit owners.

NON-WAIVABLE AND WAIVABLE RESERVES IN THE UNIT OWNER CONTROLLED ASSOCIATION:

As to the SIRS, the legislation is patently clear that unit owners may not vote for no reserves or lesser reserves for items set forth SIRS report. There is on-going debate amongst attorneys in regard to whether a condominium under three stories can waive or reduce reserves for any of the reserve items required to be in the SIRS that are included in the under three story condominium reserve, for example, roof and painting (For those interested, examine lines 1029 to 1033 and 1050 to 1071 in SB 4-D).

MANDATORY RESERVES IN THE DEVELOPER CONTROLLED ASSOCIATION:

Before turnover of control of an association by a developer to unit owners other than a developer pursuant to section 718.301, Florida Statutes, the developer-controlled association may not vote to waive the reserves or reduce the funding of the reserves (Previously, a developer could fully waive all reserves for the first two years, meaning this is a monumental change).

PRE-TURNOVER DEVELOPER DUTY:

Before a developer turns over control of an association to unit owners other than the developer, the developer must have a SIRS completed for each building on the condominium property that is three stories or higher in height.

III.    OFFICIAL RECORDS:

Official records of the condominium and cooperative association include structural integrity reserve studies, financial reports of the association or condominium, and a copy of the inspection reports and any other inspection report relating to a structural or life safety inspection of condominium or cooperative property.

In addition to the right to inspect and copy the declaration, bylaws and rules renters have the right to inspect the milestone inspection report and structural integrity reserve study inspection reports as well.

Structural integrity reserve studies must be maintained for at least 15 years after the study is completed. In addition, inspection reports report and any other inspection report relating to a structural or life safety inspection of condominium property must be maintained for 15 years after receipt of such report.

IV.    ASSOCIATION WEBSITES:

In addition to other positing requirements, the inspection reports described above and any other inspection report relating to a structural or life safety inspection of condominium property and the association’s most recent structural integrity reserve study must be posted to the website.

V.    JURISDICTION OF DIVISION OF CONDOMINIUMS, TIMESHARES, AND MOBILE HOMES:

Pre-turnover, the Division of Florida Condominiums, Timeshares, and Mobile Homes (Division) may enforce and ensure compliance with rules relating to the development, construction, sale, lease, ownership, operation, and management of residential condominium units, and complaints related to the procedural completion of milestone inspections. After turnover has occurred, the Division has jurisdiction to investigate complaints related only to financial issues, elections, and the maintenance of and unit owner access to association records, and the procedural completion of structural integrity reserve studies.

VI. NEW REPORTING REQUIREMENTS FOR ALL CONDOMINIUM AND COOPERATIVE ASSOCIATIONS:

On or before January 1, 2023, condominium associations existing on or before July 1, 2022, must provide the following information to the Division in writing, by e-mail, United States Postal Service, commercial delivery service, or hand delivery, at a physical address or e-mail address provided by the division and on a form posted on the division’s website:

  1. The number of buildings on the condominium property that are three stories or higher in height.
  2. The total number of units in all such buildings.
  3. The addresses of all such buildings.
  4. The counties in which all such buildings are located.

An association must provide an update in writing to the division if there are any changes to the information in the list within six months after the change.

VII.    APPLICABLE TO ALL SELLERS OF UNITS:

As a part of the sales process, the seller of a condominium or cooperative unit and developers must provide to potential purchasers a copy of the inspector-prepared summary of the milestone inspection report and a copy of the association’s most recent structural integrity reserve study or a statement that the association has not completed a structural integrity reserve study.

VIII.    GLITCHES:

As with any new legislation of such a substantial nature, there often follow in subsequent years what are referred to as “glitch bills” which help provide additional clarity, remove ambiguity, and fix unintended errors. To name a few: (i) the term “common areas” is used in the legislation when in fact the correct term is “common element;” (ii) clarity needs to be provided regarding whether reserve items that are required to be in SIRS, but show up in the under three story reserves, such as paint and paving, can be waived or reduced by the membership; and (iii) for those buildings that are within three miles of the coastline, additional clarity could be provided to provide better guidance as to how to perform the measurement.    

Tags: , ,
Loans and Borrowing Money – What Community Associations Need to Know

Loans and Borrowing Money – What Community Associations Need to Know

Loans and Borrowing Money – What Community Associations Need to Know

The video is ready – if you missed the webinar…watch the video now.

by Becker

There is a lot of confusion when it comes to obtaining a loan as a community association. This webinar is intended to clear the confusion and provide you with the necessary tools to obtain a loan.

You will learn:

  • What is and is not collateral for a community association loan
  • What type of loan documents to avoid
  • The borrowing process from beginning to end
  • When to get your attorney involved
Becker - Mark D. Friedman
Mark D. Friedman
SHAREHOLDER
Becker
mfriedman@beckerlawyers.com

Watch the Video !

 

Introducing The Auto-Submit Platform for Servicing Delinquent Accounts! by Axela

Introducing The Auto-Submit Platform for Servicing Delinquent Accounts! by Axela

  • Posted: Oct 20, 2024
  • By:
  • Comments: Comments Off on Introducing The Auto-Submit Platform for Servicing Delinquent Accounts! by Axela

We’re thrilled to announce a groundbreaking advancement in community association management: the launch of Auto-Submit, the industry’s first AI platform for identifying and servicing delinquent accounts, by Axela Technologies.
 
In an industry where timely recovery of past-due assessments is paramount to financial stability, Axela’s Auto-Submit is a game-changer. This cutting-edge AI engine is designed to streamline collections processes, resulting in faster resolutions and cost-effective outcomes.

 

Here’s what you need to know about Auto-Submit:
 
Efficiency at Scale: With deep integrations with leading accounting systems, Auto-Submit allows you to automate uniform collections policies and unit submissions. This ensures consistency across your portfolio and drastically improves aging trends, all while maintaining compliance with federal, state, and local laws.

Set It and Forget It: Configuring Auto-Submit is a breeze. Set your preferences, and the system executes the process from start to finish. Say goodbye to manual interventions and hello to autopilot collections.

Enhanced Responsiveness: Auto-submit doesn’t stop at collections. Our latest release also includes features for email responsiveness and call archiving. You can ensure prompt and accurate communication with homeowners with near-immediate email responses and detailed call transcriptions.

Continuous Innovation: We’re committed to advancing our AI platform to serve your needs better. As we develop new features, you can rest assured that Axela remains at the forefront of community association management technology.

We invite you to experience the future of collections with Auto-Submit. Schedule a demo today to see how Axela can transform your collections process and drive financial stability for your community.


Upcoming Event!

ONLINE AUTO-SUBMIT WEBINAR

April 18, 2024 @ 3PM EST.

Join us for an exclusive webinar unveiling Axela Technologies’ groundbreaking AI platform, Auto-Submit, revolutionizing delinquent account servicing in the CAM industry. Learn how our innovative solution ensures faster resolutions, compliance, and cost-effectiveness while putting your collections on autopilot. Don’t miss this opportunity to discover the future of collections!

Sign up Today!


Alexa Technologies is the top Collections Company SFPMA stands behind for every Condo, HOA in the State of Florida.  Every Property Management Company and their Team members should learn how Alexa can aid them with the properties they manage.  View Axela Tech’s Membership page on our members directory.

 

Tags: , , ,
Budget preparation time is upon us! We strongly encourage, that every year around this time, association managers and Boards review and ensure that your capital reserve study is accurate and up-to-date.

Budget preparation time is upon us! We strongly encourage, that every year around this time, association managers and Boards review and ensure that your capital reserve study is accurate and up-to-date.

  • Posted: Mar 13, 2024
  • By:
  • Comments: Comments Off on Budget preparation time is upon us! We strongly encourage, that every year around this time, association managers and Boards review and ensure that your capital reserve study is accurate and up-to-date.

Budget preparation time is upon us! We strongly encourage, that every year around this time, association managers and Boards review and ensure that your capital reserve study is accurate and up-to-date.

This is one of the most important decisions a board will make for the future of their association. It is an easy and effective way to ensure your community’s capital replacement items are being properly funded with minimal impact on the individual homeowners. 

With the recent update to the Capital Reserve Study Standards, the impact of inflation and supply chain issues over the past few years (in some cases resulting in costs as much as 50% higher for some typical components), it is even more critical to have an updated reserve study to ensure the financial health of your community.

To stay on track for a healthy financial future, it is recommended that your Reserve Study be updated every three (3) years.

The Falcon Group Capital Reserves team consists of 6 CAI Certified Reserve Specialists (RS) as well as a Professional Reserve Analyst (PRA) designation awarded by the Association of Professional Analysts.

Contact our Reserve Specialists today for a new or updated reserve study!

 

Contact Us:

Tampa Bay

1211 1st Avenue, N.
Suite 106
St. Petersburg, FL 33705

P (813) 438-3568

West Palm Beach

5651 Corporate Way
Suite 4
West Palm Beach, FL 33407

P (561) 290-0504

Miami

15405 NW 7th Avenue
Miami, FL 33169

P (305) 663-1970


Capital Reserve Study ( what is involved )

The primary purpose of a Reserve Study is to offer recommendations as to the amount of money a community, building or other organization should set aside on a yearly basis for the future replacement or major refurbishment of their commonly owned elements.

The Falcon Group believes that a properly funded capital reserve program is the right formula for keeping a community’s physical assets in prime condition while providing some key benefits to residents. We strongly recommend updating your Capital Reserve Study Every 3 years.

A regularly updated Reserve Study can provide the following benefits:

  • Maintaining and/or increasing property values by maintaining exterior appearances through timely repair or replacement of common elements.
  • Facilitating project efficiency and cost effectiveness, as well as, minimizing disruptions and unit owner inconvenience by allowing the association to secure contractors to complete an entire project during a finite and desired schedule.
  • Reducing the likelihood of member dissatisfaction associated with the passage of large or sudden assessments.

All of our Capital Reserve Studies are prepared under the direction of a Reserve Specialist (RS) and/or a Professional Reserve Analyst (PRA).

The Falcon Group has prepared over 3,500 Capital Reserve Studies. Each Capital Reserve Study we perform is a customized analysis, prepared in coordination with our Reserve Specialist (RS) and our client, and is based on a “real-world” methodology for each item in regards to:

  • Inspection

  • Evaluation for repair or replacement

  • Evaluation for anticipated “Useful Life”

  • Integrated into a repair or replacement plan and budget

 

Tags: , , ,
ASSOCIATION BUDGETING FOR DUMMIES

ASSOCIATION BUDGETING FOR DUMMIES

ASSOCIATION BUDGETING FOR DUMMIES

by Steven J. Weil, PhD, EA, LCAM, Royale Management Services, Inc.

A “dummie,” in this case, is a first-time association member and/or someone with little or no association budgeting experience who wants to know more about how and why the budget is created before they vote on it.

 

Bookkeeping sfpmaIs it really necessary to go through all that work year after year?

The first answer is, yes, because it’s the law. Florida law (718.112 (2) (f) 2) requires that annual budgets be prepared and, further, that reserve calculations be made by using a formula that estimates useful life and replacement cost.

The real answer is that the budget is a tool used by the association’s board to determine how much owners will be required to pay in maintenance costs for the coming year in order to keep the association financially stable.

The budget is a financial plan, a guide; but the process is an art, not a science. That’s why it’s important to leave room for unplanned expenses. A shortfall may result in an assessment, which will not make anyone happy. The only thing owners hate more than a maintenance fee increase is a special assessment that is necessary because the budget does not adequately cover the ongoing operating and maintenance costs. The tricky part of the process is to balance what is required with the often competing interests of those who want the lowest possible increase with those who are willing to pay more for better services, better amenities or other improvements.

There are two parts to every budget: the operating budget and the reserve budget.

• The operating budget should include all the necessary regular and recurring expenses that are expected in the coming year, no matter how small, such as repairs, maintenance, payroll, utilities, supplies, insurance and administrative costs.

• The reserves are designed to accumulate funds for major ongoing repair and replacement.
Statutes make it mandatory that reserve budgets first include estimated expenditures for roof replacement, building painting and pavement resurfacing at a minimum.

 

Aside from what the law requires, a good reserve budget also covers other large capital items that will wear out and need to be replaced over the life of the association, such as: elevators, windows, common area air conditioners, docks, generators, et al.

Projected estimates take into consideration the cost to replace each item, prorated over the years of its estimated life. A common mistake in estimating this value is the failure to take into account the rise in replacement costs that occurs over time.

Reserve funds cannot be used for purposes other than those intended without a majority owner’s vote of approval in advance.

 

 

How do you build a budget that works? The big secret is to start months before your current budget year ends!

  1. Step one is the information-gathering process, including a review of long-term contracts, upcoming expected maintenance and repairs, details of possible fee increases and a “wish list.” This time-consuming step includes getting quotes from vendors, examining recurring contracts for things like insurance policies, lawn and landscaping, trash removal, etc. Sometimes closely-scrutinized contracts can be renegotiated to save money. It’s also important to use caution when reducing maintenance and repairs numbers to delay an expense outlay. That could result in increased costs in the long run.
  2. Step two is to compare and, using a spreadsheet or special budget software, enter into the appropriate columns the year-to-date income and expenses — projected through year end — with the budget for the current year, to review for increases, and show the percent of difference.

  3. Step three: compare projected expenses for the coming year with “other” income (non-assessed) — such as laundry income, application fees, clubhouse rental, dock rental and any other items for which the Association collects fees other than maintenance fees.
    Using those figures, it is then possible to calculate the maintenance fees needed to fund the budget for the coming year. These required maintenance fees are calculated by subtracting the total projected “other” (non-assessed) income from the total projected expenses. This number is then allocated by the formula shown in the association documents. (The number is often based on the number of units or on square footage.)

According to the Statutes, owners may petition the Board if it adopts a budget where assessments rise more than 15% over those for the prior year. The budget must be in keeping not only with the State Statutes but also with the association’s documents, which may be more stringent.

Final approval by the board where the proposed budget is adopted must be done at a properly noticed budget meeting. A notice of this meeting, along with a copy of the proposed budget, must be sent to all owners at least 14 days prior to the meeting. Only association members may vote to waive or reduce the budgeted reserves through full or partial funding.

Failing to fund reserves at all puts everyone’s future at risk. If owners can’t afford the monthly cost how are they going to come up with the money when the roof, elevator or other capital component needs replacing? Often this is done by borrowing, making monthly maintenance payments higher because of what is required to pay back a loan, creating a double whammy of current debt repayment for past depreciation and creating an excuse not to meet current obligations. In some buildings this can create a death spiral.

 

 

Tags:
SO WHERE DO WE STAND NOW IN REGARDS TO RESERVES ? by Rafael Aquino

SO WHERE DO WE STAND NOW IN REGARDS TO RESERVES ? by Rafael Aquino

  • Posted: Oct 04, 2023
  • By:
  • Comments: Comments Off on SO WHERE DO WE STAND NOW IN REGARDS TO RESERVES ? by Rafael Aquino

SO WHERE DO WE STAND NOW IN REGARDS TO RESERVES ?

by Rafael Aquino

The use of associations funds is one of the most critical roles a board of directors manages on behalf of its members. Many times the benefit of those funds can make or break an association. It is essential to get a snapshot of what’s going on with the association’s funds before the purchase of your unit and even more so after your purchase. While it may seem challenging to know what is going on before your purchase, the reality is that you can get an idea by reviewing the financials and checking to see the association has a reserve study on file.

 

Not enough homework is done early on by potential buyers, or their agents, to determine the association’s financial strength, and they assume that all is well. That assumption can cost thousands of dollars if made incorrectly. How can you avoid it? The first step would be to dig into the financial statements; within those statements, you’ll know much money your association has in its operating account and reserve account (if it exists.) Second, you can review the Income/Expense (also known as a P&L) to determine if significant variances exist. If they do, you will need to find out why they exist. You can then compare your current operating and reserve account funds to what your reserve study states you should have. The reality is that most associations won’t meet the suggested capital contributions needed within the reserve study; however, you do want to know if the difference isn’t outrageous. If it is, you may decide not to purchase in that building, or if you’re a current owner, it may be time to sell. Remember, it’s not if it will happen, but when it will happen.

  

For individuals wondering what a reserve study is, it is a long-term capital budget planning tool that helps the board of directors and management identify both the physical analysis (useful life) and the financial analysis of the components in the common areas. This tool will allow your board to plan appropriately, project its future projects, and determine when and how the money they do have should be spent. I’ve seen it firsthand where a board wants to upgrade the pool area because they promised the owners they would improve the look of the property, but at the same time the cooling tower needs a significant overhaul. As odd as it may seem for most, this decision is simple; however, that is only true based on the leaders (board) you have appointed.

 

While many communities don’t have reserves, this should not stop you from obtaining a reserve study. The cost to get a reserve study is minimal compared to the information/knowledge you and your board would gain. We strongly recommend our clients obtain it; in fact, we had a client who listened to our suggestion and purchased a reserve study a few months before the budget season. Once they received the study, they quickly realized that it was time to start putting real plans in place. A few months later, that board decided to begin funding the reserves.

 

For those potential buyers looking to purchase in an association, make sure you do your homeowner. For those owners that already own in an association, make sure to ask your board members if they have a reserve study on file and if not to consider getting one. I believe it’s better to know what will potentially come so the proper steps and plans can be taken to either correct and/or communicate it to your membership.


 

As the Co-Founder and CEO of Affinity Management Services, Rafael P. Aquino leads his team to redefine excellence. They serve community   associations   efficiently

 

and effectively with dedication and passion. Rafael’s energy and positive spirit is the foundation of Affinity Management Services’ company culture, which instills enthusiasm and excitement when providing expert advice to its board members and relieving the day-to-day burdens of running a community association.

Since 2007, Rafael has developed a work culture that values responsive and high-quality services. He has led his team by following a proactive vs reactive philosophy. The same approach Rafael instills in the day to day operations of each association. Today, Affinity Management Services maintains its success and benefits as a result of the foundation Rafael has built and continues to foster by providing educational seminars, continuing education classes for association managers and board members alike.Rafael and his team help condominium and homeowners’ associations save money and improve their communities. His calm, personable, and service-oriented nature helps him to establish strong relationships with ease. Rafael is known as a sincere and honest leader who looks out for the best interests of his clients and communities, and he strongly advocates for their needs. His role requires coordination and communication, as such he takes logical and intelligent steps to approach challenges head-on.


As a graduate of Florida International University’s electrical engineering program and a licensed community association manager, Rafael’s education and skills equip him with unique insights to tackle complex problems through critical thinking. He understands how each component within a system works together in order to effectively arrive at solutions, techniques, and conclusions. Therefore, as he manages the multiple challenges of running a community association management company, he understands how each property is its own unique system and tailors’ specific services to assure that all their needs are met.

For more information about Rafael P. Aquino and Affinity Management Services please visit www.ManagedByAffinity.com or call 1-800-977-6279

Tags:
OWE MONEY?  YOU MAY NOT BE ALLOWED TO RUN FOR THE BOARD  By Eric Glazer, Esq.

OWE MONEY? YOU MAY NOT BE ALLOWED TO RUN FOR THE BOARD By Eric Glazer, Esq.

  • Posted: Sep 24, 2023
  • By:
  • Comments: Comments Off on OWE MONEY? YOU MAY NOT BE ALLOWED TO RUN FOR THE BOARD By Eric Glazer, Esq.

OWE MONEY?  YOU MAY NOT BE ALLOWED TO RUN FOR THE BOARD

By Eric Glazer, Esq.

I feel like I handled a thousand annual meetings in the last month, flying from one to the other.  When running the meetings, and depending upon whether the association is a condominium or HOA, it is important to know if the person running for the board, or even the winner of the election, is eligible to serve because they owe money to the association.

Let’s start with condominiums first, Florida Statute 718.112 (2)(d) states:

A person who has been suspended or removed by the division under this chapter, or who is delinquent in the payment of any assessment due to the association, is not eligible to be a candidate for board membership and may not be listed on the ballot.

So, in a condominium, the person’s eligibility to run and initially serve on the board is decided when the owner submits their notice to be a candidate, and that is no less than 40 days before the election.  If at that time,  the owner is delinquent in any assessment their name cannot be printed on the ballot and sent to the unit owners.  On the night of the election the association need not worry if anyone is delinquent and cannot serve because their name was already excluded from the ballot.

The law in a Florida HOA is much different.  Florida Statute 720.306(9)(b) states:

A person who is delinquent in the payment of any fee, fine, or other monetary obligation to the association on the day that he or she could last nominate himself or herself or be nominated for the board may not seek election to the board, and his or her name shall not be listed on the ballot. 

Lots of differences between the two statutes here.  In a condominium, you can only be prevented from being placed on the ballot if you owe an assessment.  In an HOA, your name can be prevented from being placed on the ballot if you owe any fee, fine or other monetary obligation to the association; a far more restrictive provision in an HOA.

In addition, remember that in most HOAs, nominations are taken from the floor on the night of the election.  That is the “day that he or she could last nominate himself or herself or be nominated for the board.”  Therefore, on the night of the election, we need to know if any of the proposed nominees owe any fee, fine or other monetary obligation.  If so, their name cannot be accepted into nomination.  They cannot run.

ONCE A DIRECTOR BECOMES 90 DAYS DELINQUENT

The Condominium Act states:

718.112: Director or officer delinquencies.—A director or officer more than 90 days delinquent in the payment of any monetary obligation due the association shall be deemed to have abandoned the office, creating a vacancy in the office to be filled according to law.

The Homeowners Association Act states:

720.306(9)(b) A person serving as a board member who becomes more than 90 days delinquent in the payment of any fee, fine, or other monetary obligation to the association shall be deemed to have abandoned his or her seat on the board, creating a vacancy on the board to be filled according to law.

 

Tags: , ,
SFPMA’s Condo and HOA Guide for Budget Planning and RFP’s

SFPMA’s Condo and HOA Guide for Budget Planning and RFP’s

  • Posted: Aug 05, 2023
  • By:
  • Comments: Comments Off on SFPMA’s Condo and HOA Guide for Budget Planning and RFP’s

Condo and HOA Guide for Budget Planning

Board membership can be a lot of fun socializing with neighbors and contributing ideas on how to improve the communities. But it also involves serious work with budgets, required by Florida Statutes (FS) and, generally, by the association’s by-laws for many the fun is over when its time to prepare the annual budget.

Budgets are typically approved on an annual basis during the months of October or November, but many smart boards start the budgeting process late in the summer months.

Some associations’ fiscal year does run with the annual calendar, so they should prepare their budget 4-5 months before the start of a new fiscal year. Regardless of when your fiscal year begins and ends, board members should begin the budget process by identifying operational needs and estimating expenses for the coming year.

 


 

“Who Is Responsible for Preparing the Budget?

The requirements for the preparation of the annual budget for condominium associations are set forth in Section 718.112 (2) (f) FS; and for homeowners’ associations, in Section 720.303 (6) FS.

Generally, the community association manager (CAM) is charged with the responsibility for preparing the preliminary draft of the budget and presenting it to the budget or finance committee for its review and approval. The budget committee, as appointed by the Board of Directors, and, ultimately, the Board itself, is responsible for the adoption of the association’s annual budget.”

 


A budget also helps to:

* Create proper reserve funds. Measure performance throughout the year.

* Determine the amount of fees to be assessed to each unit owner for the upcoming fiscal year.

Will homeowners be paying a little more, a little less, or about the same as last year? A well thought out budget supplies the answer.

 

-Association Budgeting Rules in Florida

Whether you serve on a condominium association or an HOA, Florida Statutes have a slew of legal requirements that affect the way budgets are presented and what they must contain. Longtime board members may be familiar with the state’s budgeting requirements under Statutes 718 and 720. If you’re a new board member, it helps to know what’s involved before diving in. Here’s a brief overview.

* All associations, whether a condominium or HOA, are required to prepare an annual budget.

* The budget must show the estimated revenues and expenses for the budget year.

* An estimated deficit or surplus for the end of the current year must be reported.

 


 

“Working Capital

As a generally accepted guideline, a community association should maintain its operating fund balance (“working capital”) at a minimum of two months’ maintenance assessments. If this guideline is not met, the Board should consider including a line item in the budget to increase working capital. However, if the working capital shortfall is significant, or if there is an accumulated deficit, a special assessment may be the more conservative alternative. The amount of the budget line item or special assessment should be determined after considering the current year’s expected results of operations.

If the current working capital is sufficient and the current year’s operations are projected to have an excess of revenues over expenses (“operating surplus”), the Board can take advantage of this situation by including line items for special projects or improvements in next year’s budget. Alternatively, that surplus can be applied as a credit to the following year’s assessments to the owners. There are generally income tax considerations in applying this credit and therefore, the Board should consult with the Association’s income tax advisor.”

 


-Preparing a Budget for your Condominium or HOA

The budgeting process really involves preparing two components: an operating and a reserve schedule. The objective is to determine what homeowners will be charged for maintaining the common areas.

* Operating budget ensures that all operational costs and expenses are identified. They assist in approximating expenses for the upcoming fiscal year.

* Reserve schedule determines the amounts needed to be set aside for capital expenditures and deferred maintenance.

Florida Statute regulations may be complex, but that doesn’t mean preparing a budget has to be complicated or overwhelming. In fact, once you understand the basics of calculating expenses, the process becomes clear-cut.

-Budgeting Tips & Considerations

Unlike a personal household budget where you figure out what you can spend based on your income, a condominium or HOA budget must begin by estimating costs first, which will then determine the amount an owner will be charged.

-Operating Component

1-Compile the current year’s year-to-date expenses. They will serve as the basis for the new budget year.

2-Analyze these expenses carefully and factor out any that are non- recurring, such as plumbing or storm-related emergencies.

3-Review your current contracts for escalation clauses and/or scheduled increases.

4-Request estimated costs for non-contractual expenses like general repairs and maintenance, utilities, and certain administrative expenses.

“Reserve Schedule

Reserve funds are used for two expenses: capital expenditures for common area components, such as roof replacement, pavement resurfacing, and elevator upgrades; and deferred maintenance that generally refers to interior and exterior painting. The funds for these big-ticket items are generally collected over years, not just in the year they’re expected to occur.

The condominium or HOA board may also have certain projects it wants to do that are not covered by reserves. This can include things like pool re-tiling, termite treatments, landscape improvements, and costs to maintain tennis, racquetball, or pickleball courts.

The projection of these fees must be as accurate as possible. Remember, condominiums and HOAs are not-for-profits so it’s important that they do not have a surplus; of course, you don’t want a deficit, either.

Budgeting is a big job, but if you break it down in these easy steps should take the stress away. Preparing an accurate budget keeps your condominium or HOA thriving financially now and in the years to come.”

 


 

“Reserves

Chapters 718 and 720 of the Florida Statutes both require the funding of reserves in the association’s annual budget (with specific waiver provisions for condominium and homeowners’ associations). The use of reserve funds is restricted for capital expenditures and deferred maintenance. A capital expenditure is the use of funds for the replacement or major repair of a common area component. Examples of capital expenditures are roof replacement, pavement resurfacing and elevator upgrades. The term “deferred maintenance” generally refers to interior and exterior painting. Reserves are included in the association’s budget so that funds are available for the eventual replacement of common area components and deferred maintenance. The alternative to funding reserves is the use of available operating funds or, more likely, the adoption of a special assessment. Sound financial management dictates that, concurrent with the adoption of a special assessment, a detailed budget should be established. Include a provision for bad debts commensurate with that of maintenance assessments.

 


-Financial stability including accounting, collections, and accounts payable services are the core to a Condo and homeowners association’s strength and future success.

Boards and their Property Management company work hand in hand providing a checks and balances system. where payables for buildings services are entered by the community manager, processed by the Payables/Accounting dept, reviewed by senior management. These are put in place for protections for all owners of the community.

Having a Management Company to aid Board Members is important. unlike self managed community associations, no one person or Board member has total control with the financial responsibility for

Online payables processing
Electronic signatures
Accounts receivable collection process
Effective internal controls
Financial statement preparation
Annual Budget preparation

This way the Management Company and Boards can work together on everything from The Communities:

 

“Here are some other guidelines to consider when preparing the Association’s budget:

*For contractual expenses, read the related contracts to identify any increases that are anticipated in the following year.

*Contact your insurance agent as early as possible to determine insurance premiums. If financing insurance, try to obtain favorable rates.

*Request estimated costs for non-contractual expenses such as general repairs and maintenance, certain administrative expenses, trash removal, and utilities.

*Include a reasonable amount for bad debt expense.

*Avoid a “Contingency” line item if possible.

*Look at revenue trends for fee-for-service charges to unit owners such as work orders, laundry, parking, etc. Be sure to consider possible increases.

*If loan repayments will be required, include the entire payment amount (i.e., principal and interest) in the budget.

 

There are other concepts to keep in mind in preparing the annual budget: Be realistic. It is generally difficult to keep maintenance assessments at last year’s levels. The role of an association’s treasurer or president is to run the association’s business. It is not to win a popularity contest. That role should be treated with as much, if not more, respect than the association’s officers’ own businesses.

The budgeting process doesn’t end with the adoption of the annual budget. Careful and routine monitoring of budget-to-actual results of operations is a vital part of the effective management of a community association.

 


Defination of budget Terms:

-Balance Sheet

One of the reports included in the Financial Reports presented to the Board of Directors is the Balance Sheet. The Balance Sheet is a statement of the book value of all of the assets and liabilities (including equity) of the association. It provides a “snapshot” of the association’s financial standing as of the end of that particular month.

-Collection Status Report

By far one of the most popular and most important reports is the aging report or the Collection Status Report. This report provides the Board with a listing of the owners that are past due. There are many variations of this report, however, the sample shown is the most concise. This report provides a glimpse of the names of those owners that are past due, the total amount past due, and at what stage in the collection process the account is in.

-Check Register and/or Accounting Software

A Check Register its a monthly report. This report is a list of all of the checks written by the association during a given period, typically each month. Among other information, it lists, the check number, the vendor’s name, the invoice number, brief description of the payment, and the check mount.

-Profit & Loss Report

The second page of the Financial Report summarizes the revenues, costs and expenses incurred during a specific period of time. The Income and Expense Report follows a general format that begins with an entry for Income and subtracts from Income the costs of running thebusiness, including operating expenses, insurance, contracted vendors, and repairs. The bottom line, literally and figuratively, is net income or loss.

Because we know Associations depend on their budget, our P&L reflects the Actual Expenses vs. the Budget Amount. This comparison is done for the current month as well as year-to-date. You are also provided with the variance (if any) between the actual expense and the budgeted amount.

-Monthly Ledger

The Monthly General Ledger is the main accounting record of a business which uses double-entry bookkeeping and is a summary of all of the transactions that occur in the company. It is built up by posting transactions recorded in the general journal. The Balance Sheet and the Income and Expense Report are both derived from the general ledger. The general ledger is where posting to the accounts occurs. Posting is the process of recording amounts as credits and debits in the pages of the general ledger. Because each bookkeeping entry debits one account and credits another account in an equal amount, the double-entry bookkeeping system will ensure that the general ledger will always be in balance.

 

In the end Board and Management Companies should upload these reports to the Secure Association website where Owners can view the financial records each year. This avoids Questioning and sometimes fighting by owners in the association regarding fees being paid with the new budgets.

 


SFPMA Directory-

SFPMA has many of the top companies ready to help condo and HOA communities with everything from Accountants Attorneys, Collection Companies, website design and Building software(CRM) and Service Companies where estimates and Bidding are always asked during budget season. If you require a RFP (Request For Proposal)Search our Members Directory Business and Service Companies and ask them to help with cost savings for your Budgets.

Find Members ready to help with Management, Business and Services for your properties.

Property Maintenance is an integral part of managing the day to day operations for every type of property. Search the Members Directory for Companies working with Property Management, Condo and HOA properties in Florida. Search companies for RFP’s in this Budget Season.

Tags: , ,
Having an Enrolled Agent (EA) can benefit you in several ways, especially when it comes to your tax-related matters.

Having an Enrolled Agent (EA) can benefit you in several ways, especially when it comes to your tax-related matters.

  • Posted: Aug 01, 2023
  • By:
  • Comments: Comments Off on Having an Enrolled Agent (EA) can benefit you in several ways, especially when it comes to your tax-related matters.

Having an Enrolled Agent (EA) can benefit you in several ways, especially when it comes to your tax-related matters.

What can an Enrolled Agent Do for You?
Here are some of the key benefits of working with an Enrolled Agent:
*Tax Expertise: Enrolled Agents are licensed by the IRS and have expertise in all areas of taxation. They can help you with tax planning, tax preparation, and tax resolution.
.
*Representation: If you are facing an audit or other tax-related issue, an Enrolled Agent can represent you before the IRS. They can help you understand your rights and responsibilities and work to resolve the issue in the most favorable way possible.
.
*Communication: Enrolled Agents are skilled at communicating complex tax issues in a way that is easy to understand. They can help you navigate the often-confusing world of taxation and provide you with guidance and advice as needed.
Savings: Working with an Enrolled Agent can help you save money by identifying deductions and credits that you may have overlooked. They can also help you avoid penalties and interest by ensuring that your taxes are filed accurately and on time.
.
*Convenience: Enrolled Agents can work with you remotely or in person, depending on your needs. They can also provide you with ongoing support throughout the year, not just during tax season.
.
Having an Enrolled Agent on your team can provide you with peace of mind and confidence in knowing that your tax-related matters are being handled by a licensed and experienced professional.

RMS AccountingAll of the tax professionals at RMS Accounting are Enrolled Agents with over 75 years of combined experience helping taxpayers resolve tax problems and to pay the lowest tax allowed by law.
Want to talk to one of your tax professionals just give us a call at 800-382-1040.
We are dedicated to the highest level of expertise in assessing the state of aging structures. Our staff is committed to saving clients time and money by determining any repair quantities during inspection.

We are dedicated to the highest level of expertise in assessing the state of aging structures. Our staff is committed to saving clients time and money by determining any repair quantities during inspection.

  • Posted: Jun 07, 2023
  • By:
  • Comments: Comments Off on We are dedicated to the highest level of expertise in assessing the state of aging structures. Our staff is committed to saving clients time and money by determining any repair quantities during inspection.

Coastal areas like South Florida have a unique need for concrete rehabilitation and protection services predominantly related to assessing structural damage.

SRI Consultants, we provide the highest level of expertise in assessing the state of aging structures and are committed to saving clients time and money by determining repair quantities during inspection. With over thirty-five years of experience, and a registered professional engineer in Florida & Virginia, the president and founder of SRI, Mr. Shirish “Raj”pathak, is a NACE Cathodic Protection Specialist. We have specialists in structural engineering, civil engineering, environmental engineering and corrosion engineering at your disposal. The extra effort and attention to detail put forth by our team ensure you receive the highest quality services available to the industry.

We are dedicated to providing the highest level of expertise in assessing the state of aging structures. Our staff is committed to saving clients time and money by determining any repair quantities during inspection.

 

ARCHITECTURE

Creativity + Partnership. Our architectural services include new building design, remodeling, site planning, interior design, and historic renovation. We collaborate with independent architects to ensure the excellence of site plans, building design and finishes.

ENGINEERING

Technical Expertise. We are experts in our field with certifications from NACE and FL Board of Professional Engineers. Our team offers civil, environmental, structural and corrosion engineering services for single & multi-story structures, condos, hotel and motels, cooling towers and seawalls.

STRUCTURAL REHABILITATION

Comprehensive Solutions. Together, we have over 50 years of experience in structural rehab, offering a full range of integrated services including condition assessments, testing, specifications preparation, bid & permit prep and project management.

TESTING

Precision + Innovation. We use the most advanced tools to identify concrete defects, assess steel corrosion, and locate moisture in structures. We offer remediation services to measurably extend the life of your investments.

 

We have specialists in structural engineering, civil engineering, environmental engineering and corrosion engineering at your disposal. The extra effort and attention to detail put forth by our team ensure you receive the highest quality services available to the industry.